BEARING,ROLLER,CYL,1ROW,6304-2Z
Material 4100002789 · BEARING · Plant 1000
AReduceNon-moving
- Material
- 4100002789
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Stock 11 exceeds the level to keep (4) by 7.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
5 / 16
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 63.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-713B SPENT CAUSTIC FAN | A | 1 | 6 | 3.14 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 17 Jun 2026 | Low | PX_KC-713B | Leak from packing |
| 12 Jun 2026 | High | PX_KC-713B | Inspect coupling KC-713B |
| 08 Apr 2026 | Medium | PX_KC-713B | Inspect coupling KC-713B |
| 13 Oct 2025 | Emergency | PX_KC-713B | Leak from packing |
| 29 Aug 2025 | Low | PX_KC-713B | Leak from packing |
| 18 Jul 2025 | Medium | PX_KC-713B | Overhaul |
Recent goods issues
Never issued in the 17-month history.