BEARING,BALL,ANGULAR,6316-2Z
Material 4100002916 · BEARING · Plant 1000
AReduceSlow-moving
- Material
- 4100002916
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.2.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.Stock 62 exceeds the level to keep (6) by 56.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
62 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.8%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 263 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 230.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 3 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1157-M MOTOR FOR PP-1157 | A | 3 | 2 | 0.19 |
| PX_KC-397A-M MOTOR FOR KC-397A | A | 1 | 0 | 0.57 |
| PX_PP-1352 LUBE OIL PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Jul 2026 | Medium | PX_PP-1157-M | Install scaffolding at PP-1157-M |
| 21 May 2025 | Medium | PX_PP-1157-M | PSM25/Install cover plate for MCP cracki |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 11 Jan 2026 | 3 | 201000038680 | Corrective |