Sparely
DU

BEARING,BALL,1ROW,DEEP GROOVE,NU316-2Z

Material 4100002978 · BEARING · Plant 1000

AReorderNormalSlow-moving
Material
4100002978
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
56 d · P80 74 d
Unit price
Rp 5.2M

Recommendation

  • 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~56 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 10.5M · order by 01 Oct 2026
Expected arrival ≈ 56 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 5.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 418 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 200.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1156A
SEAL OIL PUMP
A131.05

Lead time and procurement

Lead time 56 ± 28 days (PO history, 6 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
27 May 2026PR03
Regular replenishment
1Rp 5.1M06 Aug 202671 d
16 Apr 2026PR04
Regular (other)
2Rp 5.3M29 Jun 202674 d
23 Nov 2025PR03
Regular replenishment
2Rp 5.3M24 Jan 202662 d
01 Jul 2025PR06
Regular replenishment
2Rp 5.2M14 Sept 202575 d
19 Jun 2025PR03
Regular replenishment
2Rp 5.1M14 Jul 202525 d
30 May 2025PR03
Regular replenishment
1Rp 5.4M03 Jul 202534 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Apr 2026MediumPX_PP-1156AInstall scaffolding at PP-1156A
05 Aug 2025LowPX_PP-1156APP-1156A seal leak
17 Jun 2025MediumPX_PP-1156AReplace bearing PP-1156A

Recent goods issues

Posting dateQtyOrderOrder type
09 Aug 20252201000006284Corrective