BEARING,BALL,1ROW,DEEP GROOVE,NU316-2Z
Material 4100002978 · BEARING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100002978
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 56 d · P80 74 d
- Unit price
- Rp 5.2M
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~56 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 10.5M · order by 01 Oct 2026
Expected arrival ≈ 56 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 5.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 418 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 200.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1156A SEAL OIL PUMP | A | 1 | 3 | 1.05 |
Lead time and procurement
Lead time 56 ± 28 days (PO history, 6 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 27 May 2026 | PR03 Regular replenishment | 1 | Rp 5.1M | 06 Aug 2026 | 71 d |
| 16 Apr 2026 | PR04 Regular (other) | 2 | Rp 5.3M | 29 Jun 2026 | 74 d |
| 23 Nov 2025 | PR03 Regular replenishment | 2 | Rp 5.3M | 24 Jan 2026 | 62 d |
| 01 Jul 2025 | PR06 Regular replenishment | 2 | Rp 5.2M | 14 Sept 2025 | 75 d |
| 19 Jun 2025 | PR03 Regular replenishment | 2 | Rp 5.1M | 14 Jul 2025 | 25 d |
| 30 May 2025 | PR03 Regular replenishment | 1 | Rp 5.4M | 03 Jul 2025 | 34 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Apr 2026 | Medium | PX_PP-1156A | Install scaffolding at PP-1156A |
| 05 Aug 2025 | Low | PX_PP-1156A | PP-1156A seal leak |
| 17 Jun 2025 | Medium | PX_PP-1156A | Replace bearing PP-1156A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Aug 2025 | 2 | 201000006284 | Corrective |