BEARING,BALL,ANGULAR,7205BDB
Material 4100003059 · BEARING · Plant 1000
BMonitorSlow-moving
- Material
- 4100003059
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 54 d · P80 72 d
- Unit price
- Rp 949,282
Recommendation
- 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~54 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen PO
On hand / on order
2 / 2
next delivery 03 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 949,282
PO history
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 288 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 126.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1701B-M MOTOR FOR PP-1701B | B | 1 | 2 | 0.62 |
| PY_PP-490 COOLING WATER PUMP | S | 1 | 6 | 2.33 |
Lead time and procurement
Lead time 54 ± 37 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Jul 2026 | PR04 Regular (other) | 2 | Rp 900,656 | 03 Oct 2026 open | 91 d |
| 30 Mar 2026 | PR06 Regular replenishment | 2 | Rp 949,282 | 25 Apr 2026 | 26 d |
| 06 Nov 2025 | PR03 Regular replenishment | 2 | Rp 958,362 | 19 Dec 2025 | 43 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Aug 2026 | Medium | PY_PP-490 | PP-490 high vibration |
| 23 Jan 2026 | High | PY_PP-490 | Replace lamp as per PM finding |
| 06 Jan 2026 | Low | PX_PP-1701B-M | PP-1701B-M bearing noise |
| 13 Dec 2025 | Medium | PY_PP-490 | PP-490 seal leak |
| 07 Nov 2025 | Low | PY_PP-490 | Replace bearing PP-490 |
| 05 Nov 2025 | Low | PY_PP-490 | Oil leak at PP-490 bearing housing |
| 22 May 2025 | Medium | PX_PP-1701B-M | PP-1701B-M high temp |
| 07 May 2025 | Medium | PY_PP-490 | Overhaul PP-490 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Dec 2025 | 1 | 201000029522 | Corrective |
| 23 May 2025 | 1 | 201000014031 | Corrective |