BEARING,BALL,1ROW,DEEP GROOVE,6306 C3
Material 4100003074 · BEARING · Plant 1000
CReducePotentially obsolete
- Material
- 4100003074
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~55 days; expected demand during lead time 0.0.
- 3.A 96.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 15 exceeds the level to keep (2) by 13.
Price estimatedLead time estimated
On hand / on order
15 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
96.7%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~23 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-247B C3 RECYCLE PUMP | C | 1 | 1 | 0.62 |
| PX_KC-538 REFLUX BLOWER | S | 1 | 12 | 4.85 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Emergency | PX_KC-538 | KC-538 high vibration |
| 16 Sept 2026 | Emergency | PX_KC-538 | Leak from packing |
| 01 Sept 2026 | Medium | PX_KC-538 | KC-538 lube oil filter DP high |
| 01 Sept 2026 | Medium | PX_KC-538 | KC-538 high vibration |
| 11 Jun 2026 | Medium | PX_KC-538 | Leak from packing |
| 07 May 2026 | Medium | PX_KC-538 | KC-538 bearing temp high |
| 12 Apr 2026 | Medium | PX_KC-538 | KC-538 high vibration |
| 04 Apr 2026 | Medium | PX_KC-538 | Leak from packing |
| 30 Mar 2026 | Medium | PX_KC-538 | KC-538 high vibration |
| 01 Oct 2025 | Medium | PX_KC-538 | Leak from packing |
Recent goods issues
Never issued in the 17-month history.