BEARING,BALL,1ROW,DEEP GROOVE,NU305 C3

Material 4100003120 · BEARING · Plant 1000

AReorderNormalSlow-moving
Material
4100003120
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 5.7M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 3%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 812.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1619A-M
MOTOR FOR PP-1619A
A100.19
PX_PP-912B
BOTTOM PUMP
A100.19
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_KC-373
SPENT CAUSTIC BLOWER
S111.00

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
23 Jun 2025MediumPX_KT-383AKT-383A governor valve hunting
21 Jun 2025LowPX_KC-373Overhaul

Recent goods issues

Posting dateQtyOrderOrder type
25 Jan 20261201000017562Corrective