BEARING,BALL,1ROW,DEEP GROOVE,6219

Material 4100003178 · BEARING · Plant 1000

AReduceNon-moving
Material
4100003178
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~55 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Stock 13 exceeds the level to keep (4) by 9.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
13 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 58.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1768C-M
MOTOR FOR PP-1768C
A110.19
PX_KC-575B
METHANE COMPRESSOR
S172.71

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_KC-575BInstall scaffolding at KC-575B
15 Jul 2026LowPX_KC-575BReplace lamp as per PM finding
20 Mar 2026MediumPX_KC-575BKC-575B bearing temp high
13 Dec 2025MediumPX_KC-575BReplace lamp as per PM finding
03 Nov 2025EmergencyPX_KC-575BReplace lamp as per PM finding
05 Sept 2025MediumPX_KC-575BInstall scaffolding at KC-575B
05 Jun 2025MediumPX_KC-575BOverhaul
23 May 2025MediumPX_PP-1768C-MInstall cover plate for MCP cracking

Recent goods issues

Never issued in the 17-month history.