BEARING,ROLLER,CYL,1ROW,6308 C3
Material 4100003189 · BEARING · Plant 1000
CReorderHighStockout
- Material
- 4100003189
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- LANGIT INDUSTRI PRATAMA PT
- Lead time
- 69 d · P80 127 d
- Unit price
- Rp 780,185
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~69 days; expected demand during lead time 0.1.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
Proposed purchase requisition
2 EA
Rp 1.6M · order by 01 Oct 2026
Expected arrival ≈ 69 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.4%
stockout risk now 10%
Unit price
Rp 780,185
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 286 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~23 days.
Installed on 3 functional locations
0 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-254A SPENT CAUSTIC PUMP | C | 1 | 2 | 0.62 |
| PY_PP-1892C CHARGE GAS PUMP | C | 1 | 2 | 0.62 |
| PX_PP-1399-M MOTOR FOR PP-1399 | C | 3 | 0 | 0.19 |
Lead time and procurement
Lead time 69 ± 40 days (PO history + category, 2 PO lines) · on-time 53%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Apr 2026 | PR03 Regular replenishment | 1 | Rp 759,839 | 06 Jul 2026 | 68 d |
| 05 May 2025 | PR03 Regular replenishment | 1 | Rp 800,530 | 23 Aug 2025 | 110 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Aug 2026 | Low | PX_PP-254A | PP-254A high vibration |
| 15 Jul 2026 | Medium | PY_PP-1892C | Oil leak at PP-1892C bearing housing |
| 13 Jun 2025 | Low | PX_PP-254A | Install scaffolding at PP-254A |
| 28 May 2025 | Low | PY_PP-1892C | Install scaffolding at PP-1892C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Dec 2025 | 1 | 201000025045 | Corrective |