Sparely
DU

BEARING,ROLLER,CYL,1ROW,7218 C3

Material 4100003401 · BEARING · Plant 1000

AReorderNormalSlow-moving
Material
4100003401
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
55 d · P80 127 d
Unit price
Rp 1.4M (est.)

Recommendation

  • 1.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~55 days; expected demand during lead time 0.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 12.8M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 14%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 254 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 494.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-397A
DILUTION STEAM FAN
A110.57
PX_PP-697A
QUENCH OIL PUMP
A100.19
PX_KC-853D
SLOP OIL COMPRESSOR
B141.85
PX_PP-1141D
DILUTION STEAM PUMP
C100.19

Lead time and procurement

Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Apr 2026MediumPX_KC-853DLeak from packing
13 Apr 2026LowPX_KC-853DLeak from packing
02 Dec 2025MediumPX_KC-853DReplace lamp as per PM finding
02 Jul 2025LowPX_KC-397APainting KC-397A
27 May 2025LowPX_KC-853DRepair insulation KC-853D

Recent goods issues

Posting dateQtyOrderOrder type
20 Jan 20263201000015985Corrective