BEARING,ROLLER,CYL,1ROW,7218 C3
Material 4100003401 · BEARING · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100003401
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 3.0 EA/year: 3.0 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 10.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 12.8M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
10
order qty 4
Service level
99.9%
stockout risk now 14%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 254 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 494.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-397A DILUTION STEAM FAN | A | 1 | 1 | 0.57 |
| PX_PP-697A QUENCH OIL PUMP | A | 1 | 0 | 0.19 |
| PX_KC-853D SLOP OIL COMPRESSOR | B | 1 | 4 | 1.85 |
| PX_PP-1141D DILUTION STEAM PUMP | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 18 Apr 2026 | Medium | PX_KC-853D | Leak from packing |
| 13 Apr 2026 | Low | PX_KC-853D | Leak from packing |
| 02 Dec 2025 | Medium | PX_KC-853D | Replace lamp as per PM finding |
| 02 Jul 2025 | Low | PX_KC-397A | Painting KC-397A |
| 27 May 2025 | Low | PX_KC-853D | Repair insulation KC-853D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jan 2026 | 3 | 201000015985 | Corrective |