BEARING,BALL,1ROW,DEEP GROOVE,6307BDB
Material 4100003413 · BEARING · Plant 1000
AReorderCriticalStockout
- Material
- 4100003413
- Category
- BEARING
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 7.1M · order by 01 Oct 2026
Expected arrival ≈ 55 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 23%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 198 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 866.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1348-M MOTOR FOR PP-1348 | A | 1 | 0 | 0.19 |
| PX_PP-570 METHANOL PUMP | B | 1 | 12 | 4.90 |
| PX_PP-1628A ETHYLENE PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Sept 2026 | Medium | PX_PP-570 | PP-570 discharge pressure low |
| 22 Jul 2026 | Medium | PX_PP-570 | Install scaffolding at PP-570 |
| 29 Jun 2026 | Medium | PX_PP-570 | Replace bearing PP-570 |
| 30 Nov 2025 | Medium | PX_PP-570 | Install cover plate for MCP cracking |
| 30 Nov 2025 | Low | PX_PP-570 | Overhaul PP-570 |
| 30 Nov 2025 | Medium | PX_PP-570 | Oil leak at PP-570 bearing housing |
| 19 Nov 2025 | Medium | PX_PP-570 | PP-570 abnormal noise |
| 16 Nov 2025 | Medium | PX_PP-570 | PP-570 abnormal noise |
| 03 Nov 2025 | Medium | PX_PP-570 | PP-570 high vibration |
| 29 Oct 2025 | Medium | PX_PP-570 | Overhaul PP-570 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Mar 2026 | 1 | 201000028051 | Corrective |
| 26 Nov 2025 | 1 | 201000019604 | Corrective |