BEARING,ROLLER,CYL,1ROW,NU311 C3

Material 4100003847 · BEARING · Plant 1000

ALong-leadReorderNormalBelow reorder point
Material
4100003847
Category
BEARING
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
BUANA INSTRUMEN NUSANTARA PT
Lead time
62 d · P80 127 d
Unit price
Rp 404,818

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~62 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 23 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 809,635 · order by 01 Oct 2026
Expected arrival ≈ 62 days
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 1%
Unit price
Rp 404,818
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 108 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 316.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~23 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-200D-M
MOTOR FOR PP-200D
A100.19
PX_PP-139-M
MOTOR FOR PP-139
C120.62
PX_PP-1181B-M
MOTOR FOR PP-1181B
C100.19

Lead time and procurement

Lead time 62 ± 40 days (PO history + category, 2 PO lines) · on-time 17%

PR dateTypeQtyUnit priceDeliveryLead time
31 Jan 2026PR06
Regular replenishment
2Rp 404,04326 Mar 202654 d
07 Jul 2025PR03
Regular replenishment
2Rp 405,59207 Oct 202592 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Apr 2026EmergencyPX_PP-139-MPP-139-M high temp
08 May 2025MediumPX_PP-139-MMegger test PP-139-M

Recent goods issues

Posting dateQtyOrderOrder type
15 Jun 20261201000017271Corrective