BEARING,ROLLER,CYL,1ROW,7213BDB
Material 4100004987 · BEARING · Plant 1000
BMonitorHealthy
- Material
- 4100004987
- Category
- BEARING
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 55 d · P80 127 d
- Unit price
- Rp 1.4M (est.)
Recommendation
- 1.Forecast 1.4 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~55 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.4M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 119 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 178.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~23 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-467A BFW PUMP | B | 1 | 7 | 1.90 |
Lead time and procurement
Lead time 55 ± 40 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 16 Aug 2026 | Medium | PX_PP-467A | Install scaffolding at PP-467A |
| 23 May 2026 | Medium | PX_PP-467A | Leak from packing |
| 21 Feb 2026 | Low | PX_PP-467A | Leak from packing |
| 06 Nov 2025 | Low | PX_PP-467A | Leak from packing |
| 28 Sept 2025 | Medium | PX_PP-467A | Install scaffolding at PP-467A |
| 14 Sept 2025 | Medium | PX_PP-467A | PP-467A high vibration |
| 17 May 2025 | Low | PX_PP-467A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Jun 2026 | 1 | 201000011358 | Corrective |
| 02 Jun 2026 | 1 | 201000011358 | Corrective |