SEAL,MECHANICAL,SIZE FS410,VITON
Material 4100005111 · SEAL · Plant 1000
AReorderCriticalStockout
- Material
- 4100005111
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (45 of 60 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 17 SET/year: 13 unplanned (recency-weighted compound poisson (own history)) + 4.3 from the maintenance plan.
- 2.Lead time ~150 days; expected demand during lead time 8.0 (incl. 2.9 planned).
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 20.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 20 now.
- 5.Installed on 60 FuncLoc(s), 45 of them criticality A/B.
- 6.ML early warning: 87% probability of demand in the next 90 days.
Proposed purchase requisition
20 SET
Rp 1.9B · order by 01 Oct 2026
Expected arrival ≈ 150 days
Needs Management sign-off before it reaches the PR draft
ML early warningConvert to Stock ItemAbnormal consumptionPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 10
Rec. Max
20
order qty 2
Service level
99.7%
stockout risk now 99%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 87% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 67 days ago, 26 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 9 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 14.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 60 functional locations
45 with criticality A/B · 73 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1970 FEED PUMP | A | 1 | 6 | 1.47 |
| PX_PP-1250 METHANE PUMP | A | 1 | 4 | 1.90 |
| PX_PP-139 CAUSTIC PUMP | A | 1 | 4 | 1.90 |
| PX_PP-1619A LUBE OIL PUMP | A | 1 | 4 | 1.47 |
| PX_PP-120B FUEL OIL PUMP | A | 4 | 3 | 1.05 |
| PX_PP-1125B HYDROGEN PUMP | A | 1 | 2 | 0.62 |
| PX_PP-1478B CONDENSATE PUMP | A | 1 | 2 | 1.05 |
| PX_PP-1775A GASOLINE PUMP | A | 1 | 2 | 0.62 |
| PX_PP-336A RICH AMINE PUMP | A | 1 | 2 | 1.05 |
| PX_PP-779A LUBE OIL PUMP | A | 1 | 2 | 0.62 |
| PX_PP-1470B WASH WATER PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1801A DEMIN WATER PUMP | A | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Oct 2026 | PX_PP-1583A | Pump overhaul | 0.72 |
| 01 Dec 2026 | PX_PP-1952C | Pump overhaul | 0.72 |
| 01 Feb 2027 | PX_PP-1250 | Pump overhaul | 0.72 |
| 02 Feb 2027 | PX_PP-376A | Pump overhaul | 0.72 |
| 02 Mar 2027 | PX_PP-1744 | Pump overhaul | 0.72 |
| 02 Jun 2027 | PX_PP-1970 | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Medium | PX_PP-1938A | [MSI-B-26-ALF-384] Permanent repair |
| 26 Sept 2026 | Low | PX_PP-1938A | Overhaul PP-1938A |
| 24 Sept 2026 | Low | PX_PP-120B | PP-120B high vibration |
| 24 Sept 2026 | Emergency | PX_PP-410 | Install cover plate for MCP cracking |
| 24 Sept 2026 | Low | PX_PP-715A | Leak from packing |
| 18 Sept 2026 | Medium | PX_PP-731A | PP-731A discharge pressure low |
| 15 Sept 2026 | Medium | PX_PP-1583A | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_PP-731A | Leak from packing |
| 06 Sept 2026 | Medium | PX_PP-992B | PP-992B discharge pressure low |
| 02 Sept 2026 | High | PX_PP-1970 | Overhaul PP-1970 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jul 2026 | 1 | 201000017449 | Corrective |
| 15 Jun 2026 | 1 | 201000018563 | Corrective |
| 25 May 2026 | 1 | 201000010896 | Corrective |
| 08 Mar 2026 | 1 | 201000038883 | Corrective |
| 31 Jan 2026 | 2 | 201000012595 | Corrective |
| 12 Dec 2025 | 1 | 201000030939 | Corrective |
| 04 Dec 2025 | 1 | 201000026705 | Corrective |
| 24 Nov 2025 | 1 | 205000027888 | Other maintenance |
| 02 Nov 2025 | 1 | 201000008924 | Corrective |
| 02 Nov 2025 | 6 | 201000008924 | Corrective |
| 17 May 2025 | 2 | 204000001507 | Preventive |