SEAL,MECHANICAL,MODEL KC173,A182F11
Material 4100005196 · SEAL · Plant 1000
ALong-leadReorderCriticalSlow-moving
- Material
- 4100005196
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (17 of 19 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 140 d · P80 161 d
- Unit price
- Rp 32.1M
Recommendation
- 1.Forecast 10 SET/year: 7.9 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 2.Lead time ~140 days; expected demand during lead time 5.2 (incl. 2.1 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 17.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 15 now.
- 5.Long lead time: 80% of deliveries took up to 161 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 19 FuncLoc(s), 17 of them criticality A/B.
- 7.ML early warning: 40% probability of demand in the next 90 days.
Proposed purchase requisition
15 SET
Rp 481.5M · order by 01 Oct 2026
Expected arrival ≈ 140 days
Long-leadML early warningSingle sourcePlanned demand in lead time
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 9
Rec. Max
17
order qty 3
Service level
99.9%
stockout risk now 100%
Unit price
Rp 32.1M
PO history
ML early warning: 40% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 288 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 19 functional locations
17 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1729A COOLING WATER PUMP | A | 1 | 21 | 7.90 |
| PX_PP-1250 METHANE PUMP | A | 3 | 4 | 1.90 |
| PX_PP-292 ETHYLENE PUMP | A | 1 | 3 | 1.05 |
| UT_PP-641A PROPYLENE PUMP | A | 1 | 3 | 1.05 |
| PX_PP-1775A GASOLINE PUMP | A | 1 | 2 | 0.62 |
| PX_PP-1575A METHANE PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1821 CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-281 GASOLINE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-304 C3 RECYCLE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-992B REFLUX PUMP | B | 1 | 8 | 3.19 |
| PX_PP-1025B CAUSTIC PUMP | B | 1 | 3 | 1.05 |
| PX_PP-1253B LUBE OIL PUMP | B | 1 | 2 | 0.62 |
Lead time and procurement
Lead time 140 ± 59 days (PO history, 3 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 May 2026 | PR03 Regular replenishment | 2 | Rp 32.1M | 31 Jul 2026 | 81 d |
| 01 Jan 2026 | PR06 Regular replenishment | 2 | Rp 32.2M | 04 May 2026 | 123 d |
| 05 Sept 2025 | PR03 Regular replenishment | 1 | Rp 31.5M | 10 Mar 2026 | 186 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Feb 2027 | PX_PP-1250 | Pump overhaul | 2.15 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Medium | PX_PP-1729A | Install scaffolding at PP-1729A |
| 20 Sept 2026 | Low | PX_PP-1729A | [MSI-B-26-TCT-349] Permanent repair |
| 16 Sept 2026 | Medium | UT_PP-641A | Replace lamp as per PM finding |
| 06 Sept 2026 | Medium | PX_PP-992B | PP-992B discharge pressure low |
| 28 Aug 2026 | Emergency | PX_PP-1729A | Install scaffolding at PP-1729A |
| 26 Aug 2026 | Medium | PX_PP-1775A | PP-1775A discharge pressure low |
| 11 Aug 2026 | Medium | PX_PP-1729A | PP-1729A seal leak |
| 03 Aug 2026 | Medium | PY_PP-315A | [MSI-B-26-CTF-281] Permanent repair |
| 15 Jul 2026 | Medium | UT_PP-641A | Replace lamp as per PM finding |
| 19 Jun 2026 | Medium | PX_PP-1729A | Replace bearing PP-1729A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Dec 2025 | 1 | 201000006079 | Corrective |
| 06 Dec 2025 | 2 | 201000027213 | Corrective |
| 06 Dec 2025 | 1 | 201000027213 | Corrective |
| 30 Jun 2025 | 1 | 201000013463 | Corrective |