SEAL,MECHANICAL,MODEL KC173,A182F11

Material 4100005196 · SEAL · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100005196
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (17 of 19 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
140 d · P80 161 d
Unit price
Rp 32.1M

Recommendation

  • 1.Forecast 10 SET/year: 7.9 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
  • 2.Lead time ~140 days; expected demand during lead time 5.2 (incl. 2.1 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 14, order up to 17.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 15 now.
  • 5.Long lead time: 80% of deliveries took up to 161 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 19 FuncLoc(s), 17 of them criticality A/B.
  • 7.ML early warning: 40% probability of demand in the next 90 days.
Proposed purchase requisition
15 SET
Rp 481.5M · order by 01 Oct 2026
Expected arrival ≈ 140 days
Long-leadML early warningSingle sourcePlanned demand in lead time
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
14
safety stock 9
Rec. Max
17
order qty 3
Service level
99.9%
stockout risk now 100%
Unit price
Rp 32.1M
PO history
ML early warning: 40% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 288 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 19 functional locations

17 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1729A
COOLING WATER PUMP
A1217.90
PX_PP-1250
METHANE PUMP
A341.90
PX_PP-292
ETHYLENE PUMP
A131.05
UT_PP-641A
PROPYLENE PUMP
A131.05
PX_PP-1775A
GASOLINE PUMP
A120.62
PX_PP-1575A
METHANE PUMP
A110.19
PX_PP-1821
CAUSTIC PUMP
A100.19
PX_PP-281
GASOLINE PUMP
A100.19
PX_PP-304
C3 RECYCLE PUMP
A100.19
PX_PP-992B
REFLUX PUMP
B183.19
PX_PP-1025B
CAUSTIC PUMP
B131.05
PX_PP-1253B
LUBE OIL PUMP
B120.62

Lead time and procurement

Lead time 140 ± 59 days (PO history, 3 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
11 May 2026PR03
Regular replenishment
2Rp 32.1M31 Jul 202681 d
01 Jan 2026PR06
Regular replenishment
2Rp 32.2M04 May 2026123 d
05 Sept 2025PR03
Regular replenishment
1Rp 31.5M10 Mar 2026186 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Feb 2027PX_PP-1250Pump overhaul2.15

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-1729AInstall scaffolding at PP-1729A
20 Sept 2026LowPX_PP-1729A[MSI-B-26-TCT-349] Permanent repair
16 Sept 2026MediumUT_PP-641AReplace lamp as per PM finding
06 Sept 2026MediumPX_PP-992BPP-992B discharge pressure low
28 Aug 2026EmergencyPX_PP-1729AInstall scaffolding at PP-1729A
26 Aug 2026MediumPX_PP-1775APP-1775A discharge pressure low
11 Aug 2026MediumPX_PP-1729APP-1729A seal leak
03 Aug 2026MediumPY_PP-315A[MSI-B-26-CTF-281] Permanent repair
15 Jul 2026MediumUT_PP-641AReplace lamp as per PM finding
19 Jun 2026MediumPX_PP-1729AReplace bearing PP-1729A

Recent goods issues

Posting dateQtyOrderOrder type
17 Dec 20251201000006079Corrective
06 Dec 20252201000027213Corrective
06 Dec 20251201000027213Corrective
30 Jun 20251201000013463Corrective