SEAL,MECHANICAL,TYPE AV862,NBR

Material 4100005227 · SEAL · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100005227
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (14 of 18 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
130 d · P80 213 d
Unit price
Rp 25.0M

Recommendation

  • 1.Forecast 4.9 SET/year: 4.2 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~130 days; expected demand during lead time 1.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 18 FuncLoc(s), 14 of them criticality A/B.
Proposed purchase requisition
8 SET
Rp 200.2M · order by 01 Oct 2026
Expected arrival ≈ 130 days
Long-leadConvert to Stock ItemSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 78%
Unit price
Rp 25.0M
PO history
ML early warning: 26% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 9 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 18 functional locations

14 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-167
GASOLINE PUMP
A152.33
PX_PP-1011D
FUEL OIL PUMP
A131.47
PX_PP-1769A
LUBE OIL PUMP
A130.19
PX_PP-326A
INHIBITOR PUMP
A131.47
PX_PP-336A
RICH AMINE PUMP
A121.05
PX_PP-638A
BOTTOM PUMP
A310.19
PX_PP-570
METHANOL PUMP
B1124.90
PX_PP-169A
QUENCH OIL PUMP
B151.90
PX_PP-1434
SPENT CAUSTIC PUMP
B141.90
PX_PP-1914D
FLUSHING OIL PUMP
B120.62
PX_PP-1157
ETHYLENE PUMP
B110.19
PX_PP-1678A
METHANE PUMP
B110.19

Lead time and procurement

Lead time 130 ± 65 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
23 Mar 2026PR06
Regular replenishment
2Rp 25.0M02 Jun 202671 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Mar 2027PX_PP-167Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_PP-1470AReplace lamp as per PM finding
17 Sept 2026MediumPX_PP-411AReplace bearing PP-411A
12 Sept 2026MediumPX_PP-570PP-570 discharge pressure low
01 Sept 2026LowPX_PP-1434PP-1434 discharge pressure low
23 Aug 2026MediumPX_PP-1434PP-1434 abnormal noise
14 Aug 2026MediumPX_PP-1434Replace lamp as per PM finding
08 Aug 2026MediumPX_PP-1011DLeak from packing
27 Jul 2026MediumPX_PP-167Replace bearing PP-167
22 Jul 2026MediumPX_PP-169AInstall cover plate for MCP cracking
22 Jul 2026MediumPX_PP-570Install scaffolding at PP-570

Recent goods issues

Posting dateQtyOrderOrder type
10 Jan 20261201000038680Corrective
02 Dec 20251201000020915Corrective
26 Oct 20251201000005738Corrective