SEAL,MECHANICAL,TYPE ZE213,A105

Material 4100005287 · SEAL · Plant 1000

ALong-leadMonitorSlow-moving
Material
4100005287
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (12 of 16 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
157 d · P80 213 d
Unit price
Rp 24.4M

Recommendation

  • 1.Forecast 3.4 SET/year: 3.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~157 days; expected demand during lead time 1.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 9.
  • 4.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 16 FuncLoc(s), 12 of them criticality A/B.
Long-leadSingle source
On hand / on order
9 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
9
order qty 2
Service level
99.9%
stockout risk now 0%
Unit price
Rp 24.4M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 231 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 16 functional locations

12 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1574B
QUENCH WATER PUMP
A120.62
PX_PP-703B
REFLUX PUMP
A120.62
PX_PP-1805A
SEAL OIL PUMP
A100.19
PX_PP-1977
FLUSHING OIL PUMP
A100.19
PX_PP-233A
SLOP OIL PUMP
A200.19
PX_PP-912B
BOTTOM PUMP
A100.19
PX_PP-136B
RECYCLE ETHANE PUMP
B182.76
PX_PP-473A
CONDENSATE PUMP
B161.47
PX_PP-389
FLUSHING OIL PUMP
B120.62
PX_PP-912
BOTTOM PUMP
B120.62
PX_PP-1540
FUEL OIL PUMP
B110.19
PX_PP-128C
COOLING WATER PUMP
B100.19

Lead time and procurement

Lead time 157 ± 65 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
06 May 2025PR03
Regular replenishment
1Rp 24.4M29 Oct 2025176 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_PP-136BOil leak at PP-136B bearing housing
12 Sept 2026MediumPX_PP-473APainting PP-473A
23 Aug 2026MediumPX_PP-136BPP-136B seal leak
10 Aug 2026MediumPX_PP-1574BOverhaul PP-1574B
28 Jul 2026MediumPX_PP-1659AReplace lamp as per PM finding
16 Jul 2026MediumPX_PP-912Replace bearing PP-912
10 Jun 2026MediumPX_PP-136BInstall scaffolding at PP-136B
04 May 2026LowPX_PP-136BOil leak at PP-136B bearing housing
16 Mar 2026MediumPX_PP-1659AOil leak at PP-1659A bearing housing
10 Mar 2026LowPX_PP-136BPP-136B abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
12 Feb 20261204000033101Preventive
28 Dec 20252201000022687Corrective
25 Sept 20251201000039431Corrective
17 May 20251201000025727Corrective