SEAL,MECHANICAL,MODEL BN65,MONEL
Material 4100005289 · SEAL · Plant 1000
ALong-leadReorderNormalSlow-moving
- Material
- 4100005289
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (13 of 15 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 147 d · P80 167 d
- Unit price
- Rp 98.2M
Recommendation
- 1.Forecast 3.3 SET/year: 3.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~147 days; expected demand during lead time 1.3.
- 3.A 98.1% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 3 now.
- 5.Long lead time: 80% of deliveries took up to 167 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 15 FuncLoc(s), 13 of them criticality A/B.
Proposed purchase requisition
3 SET
Rp 294.7M · order by 01 Oct 2026
Expected arrival ≈ 147 days
Long-leadSingle source
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
6
order qty 2
Service level
98.1%
stockout risk now 8%
Unit price
Rp 98.2M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 15 functional locations
13 with criticality A/B · 16 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1121 DILUTION STEAM PUMP | A | 1 | 2 | 0.62 |
| PX_PP-1909A QUENCH WATER PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1604A DILUTION STEAM PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1809B SEAL OIL PUMP | A | 1 | 0 | 0.19 |
| PX_PP-992B REFLUX PUMP | B | 1 | 8 | 3.19 |
| PX_PP-121B REFLUX PUMP | B | 2 | 4 | 1.05 |
| PX_PP-1577D ETHYLENE PUMP | B | 1 | 2 | 1.05 |
| PX_PP-958B SEAL OIL PUMP | B | 1 | 2 | 0.62 |
| PX_PP-210A HYDROGEN PUMP | B | 1 | 1 | 0.19 |
| PX_PP-306A BFW PUMP | B | 1 | 1 | 0.19 |
| PX_PP-1751A BFW PUMP | B | 1 | 0 | 0.19 |
| PX_PP-1969B FEED PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 147 ± 58 days (PO history, 5 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 04 Mar 2026 | PR03 Regular replenishment | 1 | Rp 95.9M | 26 Jul 2026 | 144 d |
| 16 Dec 2025 | PR03 Regular replenishment | 1 | Rp 98.2M | 03 Aug 2026 | 230 d |
| 15 Sept 2025 | PR03 Regular replenishment | 1 | Rp 100.1M | 02 Jan 2026 | 109 d |
| 14 Sept 2025 | PR03 Regular replenishment | 2 | Rp 97.4M | 12 Feb 2026 | 151 d |
| 29 Jun 2025 | PR06 Regular replenishment | 2 | Rp 101.5M | 29 Sept 2025 | 92 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Sept 2026 | Medium | PX_PP-1577D | Replace bearing PP-1577D |
| 06 Sept 2026 | Medium | PX_PP-992B | PP-992B discharge pressure low |
| 05 Sept 2026 | Medium | PX_PP-121B | PP-121B discharge pressure low |
| 26 Aug 2026 | Medium | PX_PP-1121 | Oil leak at PP-1121 bearing housing |
| 24 Aug 2026 | Medium | PX_PP-121B | Install scaffolding at PP-121B |
| 22 Aug 2026 | Medium | PX_PP-958B | PP-958B discharge pressure low |
| 05 Aug 2026 | Medium | PY_PP-1869 | Install cover plate for MCP cracking |
| 21 May 2026 | Medium | PX_PP-992B | Replace lamp as per PM finding |
| 30 Apr 2026 | Medium | PX_PP-992B | Replace lamp as per PM finding |
| 20 Dec 2025 | Medium | PX_PP-992B | PP-992B seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jan 2026 | 2 | 201000025650 | Corrective |
| 23 Dec 2025 | 1 | 201000015848 | Corrective |
| 15 Nov 2025 | 1 | 201000005641 | Corrective |