Sparely
DU

SEAL,MECHANICAL,MODEL HV667,MONEL

Material 4100005349 · SEAL · Plant 1000

AReduceSlow-moving
Material
4100005349
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 3.8 SET/year: 1.0 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~150 days; expected demand during lead time 0.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.Stock 5 exceeds the level to keep (4) by 1.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 262 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 5 functional locations

3 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1634A
QUENCH OIL PUMP
A110.19
PX_PP-1797
CHARGE GAS PUMP
A200.19
PX_PP-304
C3 RECYCLE PUMP
A100.19
PX_PP-1941A
QUENCH OIL PUMP
S431.47
PX_PP-148A
REFLUX PUMP
S120.62

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jun 2027PX_PP-1941APump overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_PP-1941AReplace lamp as per PM finding
06 Jul 2026MediumPX_PP-1941AReplace lamp as per PM finding
25 Jan 2026MediumPX_PP-148APP-148A discharge pressure low
11 Jun 2025MediumPX_PP-1941A[MSI-B-25-BJE-225] Permanent repair
31 May 2025LowPX_PP-148APP-148A seal leak
27 May 2025MediumPX_PP-1634APP-1634A seal leak

Recent goods issues

Posting dateQtyOrderOrder type
12 Jan 20261201000004976Corrective