SEAL,MECHANICAL,MODEL EH530,A182F11

Material 4100005386 · SEAL · Plant 1000

AReorderNormalSlow-moving
Material
4100005386
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (6 of 9 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 2.9 SET/year: 2.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~150 days; expected demand during lead time 1.2.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 9 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 472.9M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
7
order qty 2
Service level
99.7%
stockout risk now 25%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 16% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 9 functional locations

6 with criticality A/B · 10 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1156A
SEAL OIL PUMP
A131.05
PX_PP-207
INHIBITOR PUMP
A131.47
PX_PP-1383
PROPYLENE PUMP
A100.19
PX_PP-246C
METHANOL PUMP
A100.19
PX_PP-915A
BOTTOM PUMP
A100.19
PX_PP-805B
CAUSTIC PUMP
B131.47
PX_PP-217
RICH AMINE PUMP
C241.47
PX_PP-1177
METHANE PUMP
C110.62
PX_PP-978
SPENT CAUSTIC PUMP
S110.19

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026MediumPX_PP-805BOverhaul PP-805B
29 Jun 2026MediumPX_PP-217Overhaul PP-217
12 Jun 2026MediumPX_PP-217PP-217 seal leak
27 May 2026MediumPX_PP-207Leak from packing
20 Apr 2026MediumPX_PP-1156AInstall scaffolding at PP-1156A
07 Dec 2025MediumPX_PP-805BOil leak at PP-805B bearing housing
01 Nov 2025MediumPX_PP-207PP-207 abnormal noise
07 Oct 2025MediumPX_PP-217Oil leak at PP-217 bearing housing
05 Aug 2025LowPX_PP-1156APP-1156A seal leak
07 Jul 2025MediumPX_PP-1177PSM25/Oil leak at PP-1177 bearing housin

Recent goods issues

Posting dateQtyOrderOrder type
31 Jan 20261201000013812Corrective
21 Dec 20252201000022442Corrective
12 Nov 20251201000028234Corrective
16 Sept 20251201000013643Corrective