SEAL,MECHANICAL,SIZE BN464,A105

Material 4100005401 · SEAL · Plant 1000

AReorderNormalSlow-moving
Material
4100005401
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 2.0 SET/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~150 days; expected demand during lead time 0.8.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 189.2M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
5
order qty 1
Service level
99.8%
stockout risk now 1%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 199 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-779A
LUBE OIL PUMP
A120.62
PX_PP-1155C
CONDENSATE PUMP
B193.19
PX_PP-1628A
ETHYLENE PUMP
B100.19
PX_PP-1857B
SPENT CAUSTIC PUMP
S162.33

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Aug 2026HighPX_PP-1857BPP-1857B discharge pressure low
20 Jun 2026HighPX_PP-1155COverhaul PP-1155C
12 Jun 2026LowPX_PP-1857BPP-1857B abnormal noise
20 May 2026MediumPX_PP-1155CPP-1155C discharge pressure low
29 Apr 2026MediumPX_PP-779AReplace bearing PP-779A
18 Apr 2026MediumPX_PP-1155CLeak from packing
20 Mar 2026MediumPX_PP-1857BOil leak at PP-1857B bearing housing
18 Mar 2026MediumPX_PP-1155CInstall scaffolding at PP-1155C
27 Jan 2026MediumPX_PP-1155CPP-1155C discharge pressure low
06 Jan 2026MediumPX_PP-1857BOverhaul PP-1857B

Recent goods issues

Posting dateQtyOrderOrder type
16 Mar 20261201000028051Corrective
14 Dec 20251206000013034Other maintenance