SEAL,MECHANICAL,SIZE AI498,SS316

Material 4100005478 · SEAL · Plant 1000

AReorderNormalSlow-moving
Material
4100005478
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
ANUGRAH INSTRUMEN SENTOSA PT
Lead time
106 d · P80 77 d
Unit price
Rp 38.2M

Recommendation

  • 1.Forecast 2.4 SET/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~106 days; expected demand during lead time 0.7.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 76.4M · order by 01 Oct 2026
Expected arrival ≈ 106 days
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.7%
stockout risk now 0%
Unit price
Rp 38.2M
PO history
ML early warning: 22% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 240 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 3 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-120B
FUEL OIL PUMP
A431.05
PX_PP-1882C
RECYCLE ETHANE PUMP
A120.62
PY_PP-1022B
INHIBITOR PUMP
S141.05

Lead time and procurement

Lead time 106 ± 47 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
10 Apr 2026PR03
Regular replenishment
1Rp 37.8M22 May 202642 d
22 Nov 2025PR03
Regular replenishment
1Rp 38.2M26 Feb 202696 d
10 Nov 2025PR06
Regular replenishment
2Rp 39.6M29 Dec 202549 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_PP-120BPP-120B high vibration
12 Aug 2026MediumPY_PP-1022BPP-1022B abnormal noise
31 Jan 2026MediumPX_PP-120BInstall scaffolding at PP-120B
09 Dec 2025MediumPX_PP-1882C[MSI-B-25-LFS-262/M] Replace line
08 Nov 2025LowPY_PP-1022BPP-1022B high vibration
28 Sept 2025LowPY_PP-1022BInstall scaffolding at PP-1022B
16 Aug 2025MediumPX_PP-120BPP-120B abnormal noise
16 May 2025LowPX_PP-1882COverhaul PP-1882C
11 May 2025MediumPY_PP-1022BOil leak at PP-1022B bearing housing

Recent goods issues

Posting dateQtyOrderOrder type
03 Feb 20261201000013025Corrective
02 Feb 20262201000013025Corrective
18 Jan 20261201000021796Corrective
15 Oct 20251201000016028Corrective