SEAL,MECHANICAL,MODEL VD78,A105
Material 4100005553 · SEAL · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100005553
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 3.3 SET/year: 1.9 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
- 2.Lead time ~150 days; expected demand during lead time 1.5 (incl. 0.7 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 6.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 189.2M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
6
order qty 1
Service level
99.9%
stockout risk now 1%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 415 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 5 functional locations
4 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-278 FEED PUMP | A | 4 | 6 | 2.33 |
| PX_PP-807B INHIBITOR PUMP | A | 1 | 2 | 1.05 |
| PX_PP-556A LEAN AMINE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1282 BOTTOM PUMP | B | 1 | 1 | 0.19 |
| PX_PP-244A LEAN AMINE PUMP | C | 1 | 7 | 2.33 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Nov 2026 | PX_PP-556A | Pump overhaul | 0.72 |
| 01 Mar 2027 | PX_PP-807B | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Medium | PX_PP-807B | Replace bearing PP-807B |
| 16 Sept 2026 | Medium | PX_PP-244A | Oil leak at PP-244A bearing housing |
| 09 May 2026 | Medium | PX_PP-278 | PP-278 seal leak |
| 04 May 2026 | Medium | PX_PP-278 | Replace bearing PP-278 |
| 19 Apr 2026 | Low | PX_PP-244A | Replace lamp as per PM finding |
| 09 Feb 2026 | Low | PX_PP-278 | Replace lamp as per PM finding |
| 25 Jan 2026 | Medium | PX_PP-244A | Overhaul PP-244A |
| 09 Dec 2025 | High | PX_PP-244A | Replace lamp as per PM finding |
| 19 Oct 2025 | Low | PX_PP-278 | PP-278 discharge pressure low |
| 03 Oct 2025 | Medium | PX_PP-278 | PP-278 abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Aug 2025 | 1 | 201000027779 | Corrective |