SEAL,MECHANICAL,MODEL VD78,A105

Material 4100005553 · SEAL · Plant 1000

AReorderNormalSlow-moving
Material
4100005553
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 3.3 SET/year: 1.9 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
  • 2.Lead time ~150 days; expected demand during lead time 1.5 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 6.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 189.2M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Planned demand in lead timePrice estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
6
order qty 1
Service level
99.9%
stockout risk now 1%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 415 days ago, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 5 functional locations

4 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-278
FEED PUMP
A462.33
PX_PP-807B
INHIBITOR PUMP
A121.05
PX_PP-556A
LEAN AMINE PUMP
A100.19
PX_PP-1282
BOTTOM PUMP
B110.19
PX_PP-244A
LEAN AMINE PUMP
C172.33

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PP-556APump overhaul0.72
01 Mar 2027PX_PP-807BPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-807BReplace bearing PP-807B
16 Sept 2026MediumPX_PP-244AOil leak at PP-244A bearing housing
09 May 2026MediumPX_PP-278PP-278 seal leak
04 May 2026MediumPX_PP-278Replace bearing PP-278
19 Apr 2026LowPX_PP-244AReplace lamp as per PM finding
09 Feb 2026LowPX_PP-278Replace lamp as per PM finding
25 Jan 2026MediumPX_PP-244AOverhaul PP-244A
09 Dec 2025HighPX_PP-244AReplace lamp as per PM finding
19 Oct 2025LowPX_PP-278PP-278 discharge pressure low
03 Oct 2025MediumPX_PP-278PP-278 abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
12 Aug 20251201000027779Corrective