SEAL,MECHANICAL,MODEL CE152,VITON
Material 4100005572 · SEAL · Plant 1000
BLong-leadReorderCriticalStockout
- Material
- 4100005572
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- MEGA ELEKTRIK ABADI PT
- Lead time
- 137 d · P80 136 d
- Unit price
- Rp 30.2M
Recommendation
- 1.Forecast 0.8 SET/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~137 days; expected demand during lead time 0.3.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 2 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 136 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 30.2M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 05 Dec 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 30.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 59 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 317.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~71 days.
Installed on 3 functional locations
1 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1516 METHANOL PUMP | B | 1 | 2 | 0.62 |
| PY_PP-1892C CHARGE GAS PUMP | C | 3 | 2 | 0.62 |
| PX_PP-296A RICH AMINE PUMP | S | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 137 ± 43 days (PO history, 3 PO lines) · on-time 58%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jul 2026 | PR03 Regular replenishment | 2 | Rp 29.3M | 05 Dec 2026 open | 134 d |
| 30 Nov 2025 | PR06 Regular replenishment | 1 | Rp 30.2M | 10 Mar 2026 | 100 d |
| 10 Nov 2025 | PR03 Regular replenishment | 2 | Rp 30.2M | 27 Mar 2026 | 137 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PY_PP-1892C | Oil leak at PP-1892C bearing housing |
| 15 Dec 2025 | Medium | PX_PP-1516 | PP-1516 discharge pressure low |
| 28 May 2025 | Low | PY_PP-1892C | Install scaffolding at PP-1892C |
| 24 May 2025 | Medium | PX_PP-1516 | [MSI-B-25-END-143/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Aug 2026 | 1 | 204000030240 | Preventive |