SEAL,MECHANICAL,MODEL CE152,VITON

Material 4100005572 · SEAL · Plant 1000

BLong-leadReorderCriticalStockout
Material
4100005572
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
MEGA ELEKTRIK ABADI PT
Lead time
137 d · P80 136 d
Unit price
Rp 30.2M

Recommendation

  • 1.Forecast 0.8 SET/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~137 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 136 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 SET
Rp 30.2M · order by 01 Oct 2026
Expected arrival ≈ 137 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 05 Dec 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 30.2M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 59 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 317.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~71 days.

Installed on 3 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1516
METHANOL PUMP
B120.62
PY_PP-1892C
CHARGE GAS PUMP
C320.62
PX_PP-296A
RICH AMINE PUMP
S100.19

Lead time and procurement

Lead time 137 ± 43 days (PO history, 3 PO lines) · on-time 58%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jul 2026PR03
Regular replenishment
2Rp 29.3M05 Dec 2026
open
134 d
30 Nov 2025PR06
Regular replenishment
1Rp 30.2M10 Mar 2026100 d
10 Nov 2025PR03
Regular replenishment
2Rp 30.2M27 Mar 2026137 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPY_PP-1892COil leak at PP-1892C bearing housing
15 Dec 2025MediumPX_PP-1516PP-1516 discharge pressure low
28 May 2025LowPY_PP-1892CInstall scaffolding at PP-1892C
24 May 2025MediumPX_PP-1516[MSI-B-25-END-143/M] Replace line

Recent goods issues

Posting dateQtyOrderOrder type
03 Aug 20261204000030240Preventive