SEAL,MECHANICAL,SIZE GF387,INCOLOY
Material 4100005651 · SEAL · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100005651
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- A (8 of 9 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 6.2 SET/year: 4.0 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 2.Lead time ~150 days; expected demand during lead time 1.7.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 7.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 2 now.
- 5.Installed on 9 FuncLoc(s), 8 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 189.2M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
7
order qty 1
Service level
99.8%
stockout risk now 1%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 218 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 6.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 9 functional locations
8 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-1183A BFW PUMP | A | 1 | 4 | 1.47 |
| PX_PP-500 GASOLINE PUMP | A | 1 | 3 | 1.05 |
| PX_PP-310C RECYCLE ETHANE PUMP | A | 1 | 1 | 0.62 |
| PX_PP-1541 DEMIN WATER PUMP | A | 2 | 0 | 0.19 |
| PX_PP-769B CONDENSATE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-390B SLOP OIL PUMP | B | 1 | 19 | 7.04 |
| PX_PP-154A CONDENSATE PUMP | B | 1 | 2 | 0.62 |
| PX_PP-682A RECYCLE ETHANE PUMP | B | 1 | 1 | 0.62 |
| PX_PP-1348 CHARGE GAS PUMP | C | 1 | 4 | 1.47 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Mar 2027 | PY_PP-1183A | Pump overhaul | 0.72 |
| 02 Jun 2027 | PX_PP-1541 | Pump overhaul | 1.43 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 Sept 2026 | Low | PX_PP-390B | PP-390B high vibration |
| 27 Aug 2026 | Medium | PY_PP-1183A | Replace lamp as per PM finding |
| 25 Aug 2026 | Medium | PX_PP-390B | PP-390B seal leak |
| 21 Aug 2026 | Medium | PX_PP-390B | Install scaffolding at PP-390B |
| 13 Aug 2026 | Medium | PX_PP-390B | Oil leak at PP-390B bearing housing |
| 11 Aug 2026 | Medium | PX_PP-1348 | Leak from packing |
| 27 Jun 2026 | Medium | PX_PP-1348 | Replace lamp as per PM finding |
| 13 Jun 2026 | Medium | PX_PP-154A | Leak from packing |
| 08 May 2026 | Low | PX_PP-390B | Painting PP-390B |
| 23 Apr 2026 | Medium | PX_PP-390B | [MSI-B-26-UER-253/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Feb 2026 | 1 | 201000037695 | Corrective |