SEAL,MECHANICAL,TYPE WS434,A105

Material 4100005693 · SEAL · Plant 1000

ALong-leadMonitorInsurance gap
Material
4100005693
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
137 d · P80 213 d
Unit price
Rp 53.3M

Recommendation

  • 1.Forecast 0.0 SET/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~137 days; expected demand during lead time 0.0.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.8%
stockout risk now 1%
Unit price
Rp 53.3M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 49.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-703B
REFLUX PUMP
A120.62
PX_PP-1049
PROPYLENE PUMP
A100.19

Lead time and procurement

Lead time 137 ± 65 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
07 Jun 2026PR06
Regular replenishment
1Rp 53.3M12 Sept 202697 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Nov 2025LowPX_PP-703BPP-703B discharge pressure low
04 May 2025MediumPX_PP-703BPP-703B abnormal noise

Recent goods issues

Never issued in the 17-month history.