SEAL,MECHANICAL,SIZE UP305,CS

Material 4100005704 · SEAL · Plant 1000

AReorderNormalSlow-moving
Material
4100005704
Category
SEAL
Base unit
SET
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 2.1 SET/year: 1.4 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~150 days; expected demand during lead time 0.6.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 189.2M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.7%
stockout risk now 2%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 312 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1752A
SLOP OIL PUMP
A141.90
PX_PP-1498C
CHARGE GAS PUMP
B151.90
PX_PP-720
ETHYLENE PUMP
C110.62

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jul 2027PX_PP-1498CPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Sept 2026LowPX_PP-1752A[MSI-B-26-XYL-202] Permanent repair
25 Aug 2026LowPX_PP-1498C[MSI-B-26-LAH-309/M] Replace line
22 Jul 2026HighPX_PP-1498CInstall scaffolding at PP-1498C
16 Jun 2026MediumPX_PP-1498COverhaul PP-1498C
28 Apr 2026MediumPX_PP-1498COil leak at PP-1498C bearing housing
30 Jan 2026LowPX_PP-1752AReplace bearing PP-1752A
19 Nov 2025LowPX_PP-1752A[MSI-B-25-DGU-132] Permanent repair
28 Jul 2025LowPX_PP-1752AReplace lamp as per PM finding
29 Jun 2025MediumPX_PP-1498CReplace bearing PP-1498C
07 Jun 2025LowPX_PP-720Oil leak at PP-720 bearing housing

Recent goods issues

Posting dateQtyOrderOrder type
23 Nov 20251201000009792Corrective