SEAL,MECHANICAL,TYPE BX435,PTFE

Material 4100006001 · SEAL · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100006001
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
BERKAH TEKNIK GLOBAL PT
Lead time
171 d · P80 213 d
Unit price
Rp 120.1M

Recommendation

  • 1.Forecast 0.5 SET/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~171 days; expected demand during lead time 0.3.
  • 3.A 97.2% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 SET
Rp 240.2M · order by 01 Oct 2026
Expected arrival ≈ 171 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
97.2%
stockout risk now 23%
Unit price
Rp 120.1M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 201 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 828.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-987A
INHIBITOR PUMP
A121.05

Lead time and procurement

Lead time 171 ± 65 days (PO history + category, 1 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
07 Nov 2025PR03
Regular replenishment
1Rp 120.1M28 Jun 2026233 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Aug 2025MediumPX_PP-987AReplace lamp as per PM finding
09 Jul 2025MediumPX_PP-987APP-987A abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
14 Mar 20261201000032770Corrective