SEAL,MECHANICAL,SIZE EU159,SS304
Material 4100006040 · SEAL · Plant 1000
BMonitorSlow-moving
- Material
- 4100006040
- Category
- SEAL
- Base unit
- SET
- MRP type
- Stock Item
- Criticality
- B (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 0.6 SET/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~150 days; expected demand during lead time 0.3.
- 3.A 87.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
87.6%
stockout risk now 1%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 241 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 121.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~71 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-350A REFLUX PUMP | B | 1 | 2 | 0.19 |
| PX_PP-681B FEED PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Jun 2026 | Medium | PX_PP-350A | Install scaffolding at PP-350A |
| 10 May 2025 | Medium | PX_PP-350A | PSM25/PP-350A abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Feb 2026 | 2 | 201000016884 | Corrective |