SEAL,MECHANICAL,TYPE LA401,INCOLOY

Material 4100006043 · SEAL · Plant 1000

AReduceNon-moving
Material
4100006043
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
150 d · P80 213 d
Unit price
Rp 94.6M (est.)

Recommendation

  • 1.Forecast 0.9 SET/year: 0.2 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~150 days; expected demand during lead time 0.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 7 exceeds the level to keep (2) by 5.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 246.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 3 functional locations

3 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1970
FEED PUMP
A161.47
PX_PP-417
GASOLINE PUMP
A130.62
PX_PP-205B
LEAN AMINE PUMP
B151.90

Lead time and procurement

Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Jun 2027PX_PP-1970Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Sept 2026HighPX_PP-1970Overhaul PP-1970
23 Aug 2026MediumPX_PP-205BOil leak at PP-205B bearing housing
09 Jul 2026MediumPX_PP-1970Install scaffolding at PP-1970
13 May 2026LowPX_PP-1970PP-1970 seal leak
04 May 2026MediumPX_PP-1970PP-1970 seal leak
05 Dec 2025LowPX_PP-205BPP-205B seal leak
17 Nov 2025MediumPX_PP-417Install scaffolding at PP-417
14 Nov 2025EmergencyPX_PP-1970Install scaffolding at PP-1970
08 Oct 2025MediumPX_PP-205BReplace lamp as per PM finding
07 Oct 2025MediumPX_PP-205BReplace lamp as per PM finding

Recent goods issues

Never issued in the 17-month history.