SEAL,MECHANICAL,TYPE JN880,A105
Material 4100006077 · SEAL · Plant 1000
AReorderCriticalStockout
- Material
- 4100006077
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (5 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 150 d · P80 213 d
- Unit price
- Rp 94.6M (est.)
Recommendation
- 1.Forecast 2.7 SET/year: 2.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~150 days; expected demand during lead time 1.1.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
5 SET
Rp 472.9M · order by 01 Oct 2026
Expected arrival ≈ 150 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
5
order qty 1
Service level
99.4%
stockout risk now 67%
Unit price
Rp 94.6M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 264 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 5 functional locations
5 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1729A COOLING WATER PUMP | A | 1 | 21 | 7.90 |
| PX_PP-336A RICH AMINE PUMP | A | 1 | 2 | 1.05 |
| PX_PP-442A CAUSTIC PUMP | A | 1 | 0 | 0.19 |
| PX_PP-154A CONDENSATE PUMP | B | 1 | 2 | 0.62 |
| PX_PP-669A SLOP OIL PUMP | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 150 ± 65 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Sept 2026 | Medium | PX_PP-1729A | Install scaffolding at PP-1729A |
| 20 Sept 2026 | Low | PX_PP-1729A | [MSI-B-26-TCT-349] Permanent repair |
| 28 Aug 2026 | Emergency | PX_PP-1729A | Install scaffolding at PP-1729A |
| 11 Aug 2026 | Medium | PX_PP-1729A | PP-1729A seal leak |
| 19 Jun 2026 | Medium | PX_PP-1729A | Replace bearing PP-1729A |
| 17 Jun 2026 | Medium | PX_PP-1729A | [MSI-B-26-JZF-388/M] Replace line |
| 13 Jun 2026 | Medium | PX_PP-154A | Leak from packing |
| 20 Mar 2026 | Medium | PX_PP-1729A | Repair insulation PP-1729A |
| 06 Mar 2026 | High | PX_PP-1729A | Install cover plate for MCP cracking |
| 08 Feb 2026 | Medium | PX_PP-1729A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Jan 2026 | 1 | 201000023194 | Corrective |
| 05 Dec 2025 | 1 | 201000002031 | Corrective |