SEAL,MECHANICAL,SIZE PH963,CS
Material 4100006154 · SEAL · Plant 1000
ALong-leadReorderCriticalSlow-moving
- Material
- 4100006154
- Category
- SEAL
- Base unit
- SET
- MRP type
- Non Stock
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- LANGIT INDUSTRI PRATAMA PT
- Lead time
- 127 d · P80 213 d
- Unit price
- Rp 104.4M
Recommendation
- 1.Forecast 14 SET/year: 14 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~127 days; expected demand during lead time 4.7.
- 3.A 98.4% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 20.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 19 now.
- 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
19 SET
Rp 2.0B · order by 01 Oct 2026
Expected arrival ≈ 127 days
Needs Management sign-off before it reaches the PR draft
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 11
Rec. Max
20
order qty 5
Service level
98.4%
stockout risk now 61%
Unit price
Rp 104.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 214 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.
Installed on 3 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| UT_PP-818B RICH AMINE PUMP | A | 1 | 12 | 4.90 |
| PX_PP-902B BFW PUMP | A | 1 | 8 | 2.33 |
| PX_PP-1807C C3 RECYCLE PUMP | B | 2 | 6 | 1.47 |
Lead time and procurement
Lead time 127 ± 65 days (PO history + category, 1 PO lines) · on-time 53%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 26 Dec 2025 | PR06 Regular replenishment | 2 | Rp 104.4M | 21 Feb 2026 | 57 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 Sept 2026 | Low | UT_PP-818B | Replace lamp as per PM finding |
| 05 Sept 2026 | Low | UT_PP-818B | PP-818B seal leak |
| 18 Jul 2026 | Low | PX_PP-902B | Replace lamp as per PM finding |
| 18 Jun 2026 | Medium | UT_PP-818B | Oil leak at PP-818B bearing housing |
| 12 May 2026 | Medium | PX_PP-1807C | Install scaffolding at PP-1807C |
| 24 Apr 2026 | Medium | UT_PP-818B | Replace bearing PP-818B |
| 08 Apr 2026 | High | UT_PP-818B | PP-818B abnormal noise |
| 24 Mar 2026 | Medium | UT_PP-818B | PP-818B abnormal noise |
| 02 Mar 2026 | Medium | PX_PP-902B | Install scaffolding at PP-902B |
| 01 Mar 2026 | Medium | UT_PP-818B | PP-818B seal leak |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 01 Mar 2026 | 5 | 201000014462 | Corrective |