SEAL,MECHANICAL,SIZE PH963,CS

Material 4100006154 · SEAL · Plant 1000

ALong-leadReorderCriticalSlow-moving
Material
4100006154
Category
SEAL
Base unit
SET
MRP type
Non Stock
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
LANGIT INDUSTRI PRATAMA PT
Lead time
127 d · P80 213 d
Unit price
Rp 104.4M

Recommendation

  • 1.Forecast 14 SET/year: 14 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~127 days; expected demand during lead time 4.7.
  • 3.A 98.4% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 20.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 19 now.
  • 5.Long lead time: 80% of deliveries took up to 213 days and the fastest seen in its category 71 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
19 SET
Rp 2.0B · order by 01 Oct 2026
Expected arrival ≈ 127 days
Needs Management sign-off before it reaches the PR draft
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 11
Rec. Max
20
order qty 5
Service level
98.4%
stockout risk now 61%
Unit price
Rp 104.4M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 214 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~71 days.

Installed on 3 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
UT_PP-818B
RICH AMINE PUMP
A1124.90
PX_PP-902B
BFW PUMP
A182.33
PX_PP-1807C
C3 RECYCLE PUMP
B261.47

Lead time and procurement

Lead time 127 ± 65 days (PO history + category, 1 PO lines) · on-time 53%

PR dateTypeQtyUnit priceDeliveryLead time
26 Dec 2025PR06
Regular replenishment
2Rp 104.4M21 Feb 202657 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowUT_PP-818BReplace lamp as per PM finding
05 Sept 2026LowUT_PP-818BPP-818B seal leak
18 Jul 2026LowPX_PP-902BReplace lamp as per PM finding
18 Jun 2026MediumUT_PP-818BOil leak at PP-818B bearing housing
12 May 2026MediumPX_PP-1807CInstall scaffolding at PP-1807C
24 Apr 2026MediumUT_PP-818BReplace bearing PP-818B
08 Apr 2026HighUT_PP-818BPP-818B abnormal noise
24 Mar 2026MediumUT_PP-818BPP-818B abnormal noise
02 Mar 2026MediumPX_PP-902BInstall scaffolding at PP-902B
01 Mar 2026MediumUT_PP-818BPP-818B seal leak

Recent goods issues

Posting dateQtyOrderOrder type
01 Mar 20265201000014462Corrective
Sparely