IMPELLER,SIZE FY592,NBR
Material 4100006884 · IMPELLER · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100006884
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (27 of 35 FuncLocs A/B)
- Supplier
- EUROSEAL TECHNIK GMBH
- Lead time
- 194 d · P80 247 d
- Unit price
- Rp 216.6M
Recommendation
- 1.Forecast 16 EA/year: 10 unplanned (recency-weighted compound poisson (own history)) + 5.7 from the maintenance plan.
- 2.Lead time ~194 days; expected demand during lead time 9.7 (incl. 4.3 planned).
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 21, order up to 23.
- 4.On hand 0 + on order 9 is at or below the reorder point: order 14 now.
- 5.Long lead time: 80% of deliveries took up to 247 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 35 FuncLoc(s), 27 of them criticality A/B.
- 7.ML early warning: 63% probability of demand in the next 90 days.
Proposed purchase requisition
14 EA
Rp 3.0B · order by 01 Oct 2026
Expected arrival ≈ 194 days
Needs Management sign-off before it reaches the PR draft
Long-leadML early warningConvert to Stock ItemLast turnaround used 5Single sourceOpen POPlanned demand in lead time
On hand / on order
0 / 9
next delivery 04 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
21
safety stock 12
Rec. Max
23
order qty 2
Service level
99.7%
stockout risk now 57%
Unit price
Rp 216.6M
PO history
ML early warning: 63% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 178 days ago, 20 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (5 units) excluded from the baseline.
Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 13.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.
Installed on 35 functional locations
27 with criticality A/B · 45 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-902B BFW PUMP | A | 1 | 8 | 2.33 |
| PX_PP-888A CONDENSATE PUMP | A | 1 | 6 | 1.90 |
| PX_PP-408B METHANE PUMP | A | 4 | 4 | 1.90 |
| PX_PP-1022 QUENCH WATER PUMP | A | 1 | 3 | 1.47 |
| PX_PP-1121 DILUTION STEAM PUMP | A | 3 | 2 | 0.62 |
| PX_PP-1991A FEED PUMP | A | 1 | 2 | 0.62 |
| PX_PP-807B INHIBITOR PUMP | A | 4 | 2 | 1.05 |
| PX_PP-387 INHIBITOR PUMP | A | 1 | 1 | 0.62 |
| PX_PP-592 FLUSHING OIL PUMP | A | 1 | 1 | 0.19 |
| PX_PP-1945D BOTTOM PUMP | A | 1 | 0 | 0.19 |
| PX_PP-508D FEED PUMP | A | 1 | 0 | 0.19 |
| PX_PP-604C BOTTOM PUMP | A | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 194 ± 87 days (PO history, 6 PO lines) · on-time 27%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Jun 2026 | PR05 Project / turnaround | 3 | Rp 217.2M | 04 Oct 2026 open | 125 d |
| 29 Apr 2026 | PR03 Regular replenishment | 3 | Rp 212.5M | 31 Aug 2026 | 124 d |
| 26 Feb 2026 | PR01 Import / long-lead | 6 | Rp 213.7M | 12 Feb 2027 open | 351 d |
| 22 Jan 2026 | PR10 Other | 3 | Rp 228.3M | 26 Sept 2026 | 247 d |
| 28 Sept 2025 | PR06 Regular replenishment | 4 | Rp 230.4M | 31 Mar 2026 | 184 d |
| 09 Aug 2025 | PR06 Regular replenishment | 5 | Rp 225.3M | 19 Jan 2026 | 163 d |
| 20 Jul 2025 | PR01 Import / long-lead | 8 | Rp 211.5M | 24 Sept 2026 | 431 d |
| 19 Jun 2025 | PR01 Import / long-lead | 6 | Rp 216.1M | 22 Jul 2026 | 398 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Dec 2026 | PX_PP-1106A | Pump overhaul | 0.72 |
| 01 Jan 2027 | PX_PP-508D | Pump overhaul | 0.72 |
| 01 Mar 2027 | PX_PP-807B | Pump overhaul | 2.86 |
| 02 Jul 2027 | PX_PP-1498C | Pump overhaul | 1.43 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_PP-136B | Oil leak at PP-136B bearing housing |
| 27 Sept 2026 | Medium | PX_PP-807B | Replace bearing PP-807B |
| 24 Sept 2026 | Low | PX_PP-1106A | Replace bearing PP-1106A |
| 24 Sept 2026 | Low | PX_PP-715A | Leak from packing |
| 22 Sept 2026 | Medium | PX_PP-888A | Oil leak at PP-888A bearing housing |
| 05 Sept 2026 | Low | PX_PP-1899 | Painting PP-1899 |
| 30 Aug 2026 | Medium | PX_PP-1399 | Install scaffolding at PP-1399 |
| 26 Aug 2026 | Medium | PX_PP-1121 | Oil leak at PP-1121 bearing housing |
| 25 Aug 2026 | Medium | PX_PP-1106A | PP-1106A high vibration |
| 25 Aug 2026 | Low | PX_PP-1498C | [MSI-B-26-LAH-309/M] Replace line |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Apr 2026 | 2 | 201000005444 | Corrective |
| 08 Jan 2026 | 2 | 201000025203 | Corrective |
| 27 Dec 2025 | 2 | 201000022687 | Corrective |
| 27 Dec 2025 | 1 | 201000022687 | Corrective |
| 19 Dec 2025 | 1 | 201000018318 | Corrective |
| 16 Dec 2025 | 1 | 201000026598 | Corrective |
| 08 Nov 2025 | 2 | 203000033996 | Turnaround |
| 07 Nov 2025 | 1 | 203000033996 | Turnaround |
| 06 Nov 2025 | 2 | 203000033996 | Turnaround |
| 29 Sept 2025 | 1 | 201000005438 | Corrective |