IMPELLER,SIZE SZ712,SS316
Material 4100006929 · IMPELLER · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100006929
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- PRIMA ELEKTRIK ABADI PT
- Lead time
- 169 d · P80 276 d
- Unit price
- Rp 39.5M
Recommendation
- 1.Forecast 2.1 EA/year: 1.4 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
- 2.Lead time ~169 days; expected demand during lead time 1.4 (incl. 0.7 planned).
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 6.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
- 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 236.8M · order by 01 Oct 2026
Expected arrival ≈ 169 days
Long-leadSingle sourcePlanned demand in lead time
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
6
order qty 1
Service level
99.9%
stockout risk now 100%
Unit price
Rp 39.5M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 67 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.
Installed on 5 functional locations
4 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-326A INHIBITOR PUMP | A | 1 | 3 | 1.47 |
| PX_PP-1775A GASOLINE PUMP | A | 1 | 2 | 0.62 |
| PX_PP-1323 DILUTION STEAM PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1025B CAUSTIC PUMP | B | 1 | 3 | 1.05 |
| PX_PP-705 METHANOL PUMP | S | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 169 ± 88 days (PO history + category, 1 PO lines) · on-time 30%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 28 Aug 2025 | PR03 Regular replenishment | 1 | Rp 39.5M | 31 Dec 2025 | 125 d |
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Jan 2027 | PX_PP-1323 | Pump overhaul | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Aug 2026 | Medium | PX_PP-1775A | PP-1775A discharge pressure low |
| 03 Apr 2026 | Medium | PX_PP-326A | Replace lamp as per PM finding |
| 08 Dec 2025 | Medium | PX_PP-326A | Repair insulation PP-326A |
| 18 Sept 2025 | Medium | PX_PP-1025B | Overhaul PP-1025B |
| 15 Sept 2025 | Medium | PX_PP-1025B | Overhaul PP-1025B |
| 17 Jul 2025 | Medium | PX_PP-326A | PP-326A seal leak |
| 24 May 2025 | Medium | PX_PP-1775A | Replace lamp as per PM finding |
| 21 May 2025 | Medium | PX_PP-1025B | PP-1025B high vibration |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Jul 2026 | 1 | 201000010816 | Corrective |