IMPELLER,MODEL MC637,CS

Material 4100006942 · IMPELLER · Plant 1000

AMonitorInsurance gap
Material
4100006942
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
184 d · P80 276 d
Unit price
Rp 102.1M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~184 days; expected demand during lead time 0.1.
  • 3.A 94.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
94.7%
stockout risk now 5%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 243.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-588
DILUTION STEAM PUMP
A120.19
PX_PP-987A
INHIBITOR PUMP
A121.05
PX_PP-1253B
LUBE OIL PUMP
B120.62
PY_PP-1892C
CHARGE GAS PUMP
C120.62
PX_PP-319
QUENCH OIL PUMP
S100.19

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Aug 2026MediumPX_PP-588Install scaffolding at PP-588
15 Jul 2026MediumPY_PP-1892COil leak at PP-1892C bearing housing
25 Mar 2026MediumPX_PP-1253BPP-1253B seal leak
01 Aug 2025MediumPX_PP-987AReplace lamp as per PM finding
09 Jul 2025MediumPX_PP-987APP-987A abnormal noise
28 May 2025LowPY_PP-1892CInstall scaffolding at PP-1892C
17 May 2025MediumPX_PP-588PP-588 high vibration
08 May 2025LowPX_PP-1253BPP-1253B seal leak

Recent goods issues

Never issued in the 17-month history.