IMPELLER,MODEL BO766,MONEL

Material 4100007112 · IMPELLER · Plant 1000

AReorderCriticalStockout
Material
4100007112
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
184 d · P80 276 d
Unit price
Rp 102.1M (est.)

Recommendation

  • 1.Forecast 0.8 EA/year: 0.1 unplanned (installed-base failure prior (no history)) + 0.7 from the maintenance plan.
  • 2.Lead time ~184 days; expected demand during lead time 0.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 2 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 204.2M · order by 01 Oct 2026
Expected arrival ≈ 184 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
100.0%
stockout risk now 3%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 112.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 2 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-795D
FEED PUMP
A200.19
PX_PP-1397
METHANOL PUMP
B141.05

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
13 Aug 2027PX_PP-1397Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Aug 2026LowPX_PP-1397Replace lamp as per PM finding
27 Oct 2025MediumPX_PP-1397PP-1397 abnormal noise
05 Oct 2025LowPX_PP-1397Install scaffolding at PP-1397
17 May 2025MediumPX_PP-1397Install scaffolding at PP-1397

Recent goods issues

Never issued in the 17-month history.