Sparely
DU

IMPELLER,TYPE AS185,CS

Material 4100007150 · IMPELLER · Plant 1000

AMonitorCritical insurance spare
Material
4100007150
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
184 d · P80 276 d
Unit price
Rp 102.1M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~184 days; expected demand during lead time 0.1.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.0%
stockout risk now 1%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 661.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-166A
SPENT CAUSTIC PUMP
A110.19
PX_PP-390B
SLOP OIL PUMP
B1197.04

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Sept 2026LowPX_PP-390BPP-390B high vibration
25 Aug 2026MediumPX_PP-390BPP-390B seal leak
21 Aug 2026MediumPX_PP-390BInstall scaffolding at PP-390B
13 Aug 2026MediumPX_PP-390BOil leak at PP-390B bearing housing
08 May 2026LowPX_PP-390BPainting PP-390B
23 Apr 2026MediumPX_PP-390B[MSI-B-26-UER-253/M] Replace line
10 Apr 2026MediumPX_PP-390BOil leak at PP-390B bearing housing
23 Mar 2026LowPX_PP-390BPP-390B discharge pressure low
17 Mar 2026LowPX_PP-390BLeak from packing
09 Mar 2026LowPX_PP-390BOverhaul PP-390B

Recent goods issues

Never issued in the 17-month history.