IMPELLER,SIZE YT672,CS

Material 4100007441 · IMPELLER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100007441
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
PRIMA ELEKTRIK ABADI PT
Lead time
189 d · P80 276 d
Unit price
Rp 124.9M

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~189 days; expected demand during lead time 0.6.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 0 + on order 3 is at or below the reorder point: order 1 now.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 124.9M · order by 01 Oct 2026
Expected arrival ≈ 189 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 3
next delivery 18 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 124.9M
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 4 functional locations

3 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1478B
CONDENSATE PUMP
A121.05
PX_PP-483B
LEAN AMINE PUMP
B151.90
PX_PP-517A
CHARGE GAS PUMP
B100.19
PX_PP-319
QUENCH OIL PUMP
S100.19

Lead time and procurement

Lead time 189 ± 88 days (PO history + category, 2 PO lines) · on-time 30%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jun 2026PR06
Regular replenishment
1Rp 125.4M18 Nov 2026
open
147 d
05 May 2026PR06
Regular replenishment
2Rp 124.3M04 Jan 2027
open
244 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Aug 2026MediumPX_PP-483BPP-483B abnormal noise
29 Jun 2026MediumPX_PP-483BOil leak at PP-483B bearing housing
23 May 2026MediumPX_PP-1478BOverhaul PP-1478B
18 Nov 2025MediumPX_PP-483BLeak from packing
18 Nov 2025MediumPX_PP-483BReplace lamp as per PM finding
24 Jul 2025MediumPX_PP-1478BLeak from packing
24 May 2025MediumPX_PP-483BInstall scaffolding at PP-483B

Recent goods issues

Posting dateQtyOrderOrder type
02 Jan 20261201000014589Corrective