IMPELLER,SIZE YT672,CS
Material 4100007441 · IMPELLER · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100007441
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- PRIMA ELEKTRIK ABADI PT
- Lead time
- 189 d · P80 276 d
- Unit price
- Rp 124.9M
Recommendation
- 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~189 days; expected demand during lead time 0.6.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
- 4.On hand 0 + on order 3 is at or below the reorder point: order 1 now.
- 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 124.9M · order by 01 Oct 2026
Expected arrival ≈ 189 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 3
next delivery 18 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.7%
stockout risk now 0%
Unit price
Rp 124.9M
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1478B CONDENSATE PUMP | A | 1 | 2 | 1.05 |
| PX_PP-483B LEAN AMINE PUMP | B | 1 | 5 | 1.90 |
| PX_PP-517A CHARGE GAS PUMP | B | 1 | 0 | 0.19 |
| PX_PP-319 QUENCH OIL PUMP | S | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 189 ± 88 days (PO history + category, 2 PO lines) · on-time 30%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jun 2026 | PR06 Regular replenishment | 1 | Rp 125.4M | 18 Nov 2026 open | 147 d |
| 05 May 2026 | PR06 Regular replenishment | 2 | Rp 124.3M | 04 Jan 2027 open | 244 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2026 | Medium | PX_PP-483B | PP-483B abnormal noise |
| 29 Jun 2026 | Medium | PX_PP-483B | Oil leak at PP-483B bearing housing |
| 23 May 2026 | Medium | PX_PP-1478B | Overhaul PP-1478B |
| 18 Nov 2025 | Medium | PX_PP-483B | Leak from packing |
| 18 Nov 2025 | Medium | PX_PP-483B | Replace lamp as per PM finding |
| 24 Jul 2025 | Medium | PX_PP-1478B | Leak from packing |
| 24 May 2025 | Medium | PX_PP-483B | Install scaffolding at PP-483B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Jan 2026 | 1 | 201000014589 | Corrective |