IMPELLER,MODEL NZ509,PTFE

Material 4100007487 · IMPELLER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100007487
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
174 d · P80 276 d
Unit price
Rp 99.5M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~174 days; expected demand during lead time 1.2 (incl. 0.7 planned).
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 497.4M · order by 01 Oct 2026
Expected arrival ≈ 174 days
Long-leadConvert to Stock ItemSingle sourcePlanned demand in lead time
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 3
Rec. Max
5
order qty 1
Service level
99.9%
stockout risk now 100%
Unit price
Rp 99.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 290 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 3 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1250
METHANE PUMP
A141.90
PX_PP-166A
SPENT CAUSTIC PUMP
A210.19
PX_PP-1366A
C3 RECYCLE PUMP
S140.62

Lead time and procurement

Lead time 174 ± 88 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
22 May 2026PR06
Regular replenishment
1Rp 98.3M26 Sept 2026127 d
19 Jan 2026PR10
Other
1Rp 100.7M31 Jul 2026193 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Feb 2027PX_PP-1250Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Feb 2026MediumPX_PP-1366APP-1366A high vibration
26 Dec 2025LowPX_PP-1366AInstall scaffolding at PP-1366A
18 Dec 2025LowPX_PP-1250PP-1250 high vibration
16 Nov 2025HighPX_PP-1250Leak from packing
13 Nov 2025LowPX_PP-1366APainting PP-1366A
20 Oct 2025LowPX_PP-1250PP-1250 seal leak
20 Jun 2025MediumPX_PP-1250PP-1250 seal leak
20 May 2025MediumPX_PP-166AOil leak at PP-166A bearing housing
19 May 2025LowPX_PP-1366APP-1366A seal leak

Recent goods issues

Posting dateQtyOrderOrder type
15 Dec 20251201000006079Corrective
30 Jun 20251201000013463Corrective