IMPELLER,TYPE NO705,NBR
Material 4100007611 · IMPELLER · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100007611
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 184 d · P80 276 d
- Unit price
- Rp 102.1M (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~184 days; expected demand during lead time 0.4.
- 3.A 98.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
3 EA
Rp 306.3M · order by 01 Oct 2026
Expected arrival ≈ 184 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
98.0%
stockout risk now 19%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 388 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 941.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-251C RICH AMINE PUMP | A | 1 | 2 | 1.05 |
Lead time and procurement
Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Nov 2025 | Medium | PX_PP-251C | Repair insulation PP-251C |
| 15 Jun 2025 | Low | PX_PP-251C | Oil leak at PP-251C bearing housing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 08 Sept 2025 | 2 | 201000015962 | Corrective |