IMPELLER,MODEL QG966,A105

Material 4100007703 · IMPELLER · Plant 1000

SReduceSlow-moving
Material
4100007703
Category
IMPELLER
Base unit
EA
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
184 d · P80 276 d
Unit price
Rp 208.6M

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~184 days; expected demand during lead time 0.2.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 1 exceeds the level to keep (0) by 1.
Convert to Non StockSingle sourceOpen POLead time estimated
On hand / on order
1 / 2
next delivery 17 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 208.6M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 382 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~105 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1171
BOTTOM PUMP
S121.05

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
09 Oct 2025PR03
Regular replenishment
2Rp 208.6M17 Oct 2026
open
373 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Sept 2025EmergencyPX_PP-1171PP-1171 high vibration
25 Aug 2025MediumPX_PP-1171PP-1171 abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
14 Sept 20251202000000023Emergency