IMPELLER,MODEL RF857,PTFE
Material 4100008132 · IMPELLER · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100008132
- Category
- IMPELLER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- RAJAWALI PERKASA JAYA PT
- Lead time
- 171 d · P80 276 d
- Unit price
- Rp 68.5M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~171 days; expected demand during lead time 0.3.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
- 4.On hand 0 + on order 1 is at or below the reorder point: order 2 now.
- 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 137.0M · order by 01 Oct 2026
Expected arrival ≈ 171 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 28 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 4%
Unit price
Rp 68.5M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 412 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1945B PROPYLENE PUMP | A | 1 | 4 | 1.47 |
Lead time and procurement
Lead time 171 ± 88 days (PO history + category, 1 PO lines) · on-time 15%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Aug 2026 | PR06 Regular replenishment | 1 | Rp 68.5M | 28 Dec 2026 open | 133 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jan 2026 | Low | PX_PP-1945B | PP-1945B high vibration |
| 28 Aug 2025 | Low | PX_PP-1945B | Replace lamp as per PM finding |
| 13 Aug 2025 | Low | PX_PP-1945B | Install scaffolding at PP-1945B |
| 11 Aug 2025 | Medium | PX_PP-1945B | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Aug 2025 | 1 | 201000027864 | Corrective |
| 14 Aug 2025 | 1 | 201000027864 | Corrective |