IMPELLER,MODEL RF857,PTFE

Material 4100008132 · IMPELLER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100008132
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
RAJAWALI PERKASA JAYA PT
Lead time
171 d · P80 276 d
Unit price
Rp 68.5M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~171 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 2 now.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2 EA
Rp 137.0M · order by 01 Oct 2026
Expected arrival ≈ 171 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 28 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 4%
Unit price
Rp 68.5M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 412 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1945B
PROPYLENE PUMP
A141.47

Lead time and procurement

Lead time 171 ± 88 days (PO history + category, 1 PO lines) · on-time 15%

PR dateTypeQtyUnit priceDeliveryLead time
17 Aug 2026PR06
Regular replenishment
1Rp 68.5M28 Dec 2026
open
133 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jan 2026LowPX_PP-1945BPP-1945B high vibration
28 Aug 2025LowPX_PP-1945BReplace lamp as per PM finding
13 Aug 2025LowPX_PP-1945BInstall scaffolding at PP-1945B
11 Aug 2025MediumPX_PP-1945BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
15 Aug 20251201000027864Corrective
14 Aug 20251201000027864Corrective