IMPELLER,SIZE DM745,CS

Material 4100008223 · IMPELLER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100008223
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
MITRA PERKASA NUSANTARA PT
Lead time
194 d · P80 276 d
Unit price
Rp 127.8M

Recommendation

  • 1.Forecast 1.3 EA/year: 1.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~194 days; expected demand during lead time 0.7.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 276 days and the fastest seen in its category 105 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 511.2M · order by 01 Oct 2026
Expected arrival ≈ 194 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.5%
stockout risk now 49%
Unit price
Rp 127.8M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-103
COOLING WATER PUMP
A172.33
PX_PP-1194B
RICH AMINE PUMP
A100.19

Lead time and procurement

Lead time 194 ± 88 days (PO history + category, 1 PO lines) · on-time 48%

PR dateTypeQtyUnit priceDeliveryLead time
08 Jul 2025PR03
Regular replenishment
2Rp 127.8M16 Feb 2026223 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_PP-103Oil leak at PP-103 bearing housing
24 Sept 2026MediumPX_PP-103PP-103 abnormal noise
10 Jan 2026MediumPX_PP-103PP-103 seal leak
19 Nov 2025EmergencyPX_PP-103Install scaffolding at PP-103
22 Oct 2025MediumPX_PP-103[MSI-B-25-WHU-395] Permanent repair
06 Sept 2025MediumPX_PP-103PP-103 seal leak
25 May 2025MediumPX_PP-103Install scaffolding at PP-103

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000014601Corrective