Sparely
DU

IMPELLER,SIZE HY82,A105

Material 4100008564 · IMPELLER · Plant 1000

AReorderCriticalStockout
Material
4100008564
Category
IMPELLER
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
184 d · P80 276 d
Unit price
Rp 102.1M (est.)

Recommendation

  • 1.Forecast 2.0 EA/year: 2.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~184 days; expected demand during lead time 1.0.
  • 3.A 98.6% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 612.6M · order by 01 Oct 2026
Expected arrival ≈ 184 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
98.6%
stockout risk now 39%
Unit price
Rp 102.1M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 291 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~105 days.

Installed on 4 functional locations

4 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-695B
CAUSTIC PUMP
A100.19
PX_PP-765B
QUENCH OIL PUMP
A100.19
PX_PP-1628A
ETHYLENE PUMP
B100.19
PX_PP-311C
REFLUX PUMP
B100.19

Lead time and procurement

Lead time 184 ± 88 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
14 Dec 20252206000013034Other maintenance
12 Dec 20252201000000773Corrective
30 Aug 20252201000035773Corrective