Sparely
DU

SLEEVE,SHAFT,TYPE NY787,A182F11

Material 4100008733 · SLEEVE · Plant 1000

ALong-leadReorderCriticalBelow reorder point
Material
4100008733
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
A (19 of 23 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
196 d · P80 210 d
Unit price
Rp 25.4M

Recommendation

  • 1.Forecast 7.5 EA/year: 6.8 unplanned (credibility blend: own history + installed-base prior) + 0.7 from the maintenance plan.
  • 2.Lead time ~196 days; expected demand during lead time 3.6.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 13.
  • 4.On hand 1 + on order 3 is at or below the reorder point: order 9 now.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 23 FuncLoc(s), 19 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 228.3M · order by 01 Oct 2026
Expected arrival ≈ 196 days
Long-leadSingle sourceOpen PO
On hand / on order
1 / 3
next delivery 16 Mar 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 7
Rec. Max
13
order qty 3
Service level
99.7%
stockout risk now 33%
Unit price
Rp 25.4M
PO history
ML early warning: 29% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 48 days ago, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 23 functional locations

19 with criticality A/B · 27 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1729A
COOLING WATER PUMP
A2217.90
PX_PP-1460A
SEAL OIL PUMP
A193.19
PX_PP-1862
HYDROGEN PUMP
A151.47
PX_PP-408B
METHANE PUMP
A141.90
PX_PP-1166B
BFW PUMP
A120.62
PX_PP-339C
SLOP OIL PUMP
A110.19
PX_PP-1099
LUBE OIL PUMP
A100.19
PX_PP-1384B
COOLING WATER PUMP
A100.19
PX_PP-1721A
LUBE OIL PUMP
A400.19
PX_PP-1809B
SEAL OIL PUMP
A100.19
PX_PP-765B
QUENCH OIL PUMP
A100.19
PX_PP-891C
CHARGE GAS PUMP
A100.19

Lead time and procurement

Lead time 196 ± 55 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR03
Regular replenishment
1Rp 25.0M04 Jun 2027
open
290 d
04 Jun 2026PR06
Regular replenishment
2Rp 25.7M16 Mar 2027
open
285 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Aug 2027PX_PP-536Pump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-1729AInstall scaffolding at PP-1729A
20 Sept 2026LowPX_PP-1729A[MSI-B-26-TCT-349] Permanent repair
12 Sept 2026MediumPX_PP-479Install scaffolding at PP-479
05 Sept 2026LowPX_PP-1899Painting PP-1899
28 Aug 2026EmergencyPX_PP-1729AInstall scaffolding at PP-1729A
18 Aug 2026MediumPX_PP-479Oil leak at PP-479 bearing housing
11 Aug 2026MediumPX_PP-1460APP-1460A seal leak
11 Aug 2026MediumPX_PP-1729APP-1729A seal leak
01 Aug 2026MediumPX_PP-408B[MSI-B-26-NMP-200/M] Replace line
13 Jul 2026LowPX_PP-1460APP-1460A high vibration

Recent goods issues

Posting dateQtyOrderOrder type
14 Aug 20261201000039930Corrective
26 Jan 20261201000001593Corrective
22 Jan 20261201000025721Corrective
15 Sept 20252201000039095Corrective