SLEEVE,SHAFT,MODEL AY661,MONEL

Material 4100008748 · SLEEVE · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100008748
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
A (11 of 16 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
126 d · P80 210 d
Unit price
Rp 16.4M

Recommendation

  • 1.Forecast 4.2 EA/year: 4.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~126 days; expected demand during lead time 1.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 9.
  • 4.On hand 2 + on order 1 is at or below the reorder point: order 6 now.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 16 FuncLoc(s), 11 of them criticality A/B.
  • 7.ML early warning: 37% probability of demand in the next 90 days.
Proposed purchase requisition
6 EA
Rp 98.6M · order by 01 Oct 2026
Expected arrival ≈ 126 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
2 / 1
next delivery 28 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
9
order qty 2
Service level
99.8%
stockout risk now 22%
Unit price
Rp 16.4M
PO history
ML early warning: 37% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 253 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 16 functional locations

11 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1819A
SLOP OIL PUMP
A151.90
PX_PP-1862
HYDROGEN PUMP
A351.47
PX_PP-500
GASOLINE PUMP
A231.05
PX_PP-1967A
WASH WATER PUMP
A110.19
PX_PP-900A
LEAN AMINE PUMP
A110.19
PX_PP-1101A
REFLUX PUMP
A100.19
PX_PP-1115
SLOP OIL PUMP
A100.19
PX_PP-1865A
METHANOL PUMP
A100.19
PX_PP-1807C
C3 RECYCLE PUMP
B161.47
PX_PP-1597B
C3 RECYCLE PUMP
B100.19
PX_PP-1886B
C4 PRODUCT PUMP
B300.19
PX_PP-1898A
INHIBITOR PUMP
C120.62

Lead time and procurement

Lead time 126 ± 55 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
22 Jul 2026PR03
Regular replenishment
1Rp 16.4M28 Oct 2026
open
98 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Aug 2026LowPX_PP-254APP-254A high vibration
04 Jul 2026MediumPX_PP-1819APP-1819A abnormal noise
21 Jun 2026LowPX_PP-1819A[MSI-B-26-NPM-141] Permanent repair
31 May 2026LowPX_PP-1862PP-1862 seal leak
18 May 2026HighPX_PP-1819APP-1819A seal leak
17 May 2026MediumPX_PP-1862Replace lamp as per PM finding
12 May 2026MediumPX_PP-1807CInstall scaffolding at PP-1807C
10 Apr 2026HighPX_PP-1862Install scaffolding at PP-1862
06 Apr 2026LowPX_PP-500Replace bearing PP-500
24 Jan 2026MediumPX_PP-1807CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
21 Jan 20261201000014244Corrective
22 Dec 20253201000017093Corrective
18 Sept 20251201000032231Corrective