SLEEVE,SHAFT,TYPE UV512,A182F11
Material 4100008762 · SLEEVE · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100008762
- Category
- SLEEVE
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- SAMUDRA TEKNOLOGI INTERNASIONAL PT
- Lead time
- 126 d · P80 210 d
- Unit price
- Rp 18.9M
Recommendation
- 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~126 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
- 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 75.7M · order by 01 Oct 2026
Expected arrival ≈ 126 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 27%
Unit price
Rp 18.9M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.
Installed on 6 functional locations
4 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-739 ETHYLENE PUMP | A | 1 | 0 | 0.19 |
| PX_PP-1282 BOTTOM PUMP | B | 4 | 1 | 0.19 |
| PX_PP-1370C FUEL OIL PUMP | B | 1 | 0 | 0.19 |
| PX_PP-841B COOLING WATER PUMP | B | 1 | 0 | 0.19 |
| PY_PP-1892C CHARGE GAS PUMP | C | 1 | 2 | 0.62 |
| PX_PP-1892B GASOLINE PUMP | S | 1 | 3 | 1.05 |
Lead time and procurement
Lead time 126 ± 55 days (PO history + category, 1 PO lines) · on-time 25%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 May 2025 | PR06 Regular replenishment | 2 | Rp 18.9M | 30 Aug 2025 | 100 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_PP-1892B | Replace lamp as per PM finding |
| 23 Sept 2026 | Medium | PX_PP-1892B | PP-1892B abnormal noise |
| 15 Jul 2026 | Medium | PY_PP-1892C | Oil leak at PP-1892C bearing housing |
| 28 May 2025 | Low | PY_PP-1892C | Install scaffolding at PP-1892C |
| 20 May 2025 | Medium | PX_PP-1282 | Leak from packing |
| 11 May 2025 | Medium | PX_PP-1892B | PP-1892B abnormal noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jan 2026 | 1 | 206000030347 | Other maintenance |