Sparely
DU

SLEEVE,SHAFT,TYPE UV512,A182F11

Material 4100008762 · SLEEVE · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100008762
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
SAMUDRA TEKNOLOGI INTERNASIONAL PT
Lead time
126 d · P80 210 d
Unit price
Rp 18.9M

Recommendation

  • 1.Forecast 0.9 EA/year: 0.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~126 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 4 now.
  • 5.Long lead time: 80% of deliveries took up to 210 days and the fastest seen in its category 67 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 75.7M · order by 01 Oct 2026
Expected arrival ≈ 126 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
100.0%
stockout risk now 27%
Unit price
Rp 18.9M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 6 functional locations

4 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-739
ETHYLENE PUMP
A100.19
PX_PP-1282
BOTTOM PUMP
B410.19
PX_PP-1370C
FUEL OIL PUMP
B100.19
PX_PP-841B
COOLING WATER PUMP
B100.19
PY_PP-1892C
CHARGE GAS PUMP
C120.62
PX_PP-1892B
GASOLINE PUMP
S131.05

Lead time and procurement

Lead time 126 ± 55 days (PO history + category, 1 PO lines) · on-time 25%

PR dateTypeQtyUnit priceDeliveryLead time
22 May 2025PR06
Regular replenishment
2Rp 18.9M30 Aug 2025100 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-1892BReplace lamp as per PM finding
23 Sept 2026MediumPX_PP-1892BPP-1892B abnormal noise
15 Jul 2026MediumPY_PP-1892COil leak at PP-1892C bearing housing
28 May 2025LowPY_PP-1892CInstall scaffolding at PP-1892C
20 May 2025MediumPX_PP-1282Leak from packing
11 May 2025MediumPX_PP-1892BPP-1892B abnormal noise

Recent goods issues

Posting dateQtyOrderOrder type
14 Jan 20261206000030347Other maintenance