SLEEVE,SHAFT,SIZE MI977,VITON

Material 4100008781 · SLEEVE · Plant 1000

AReorderNormalSlow-moving
Material
4100008781
Category
SLEEVE
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 5.8 EA/year: 5.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~135 days; expected demand during lead time 2.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 14.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 11 now.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 89.0M · order by 01 Oct 2026
Expected arrival ≈ 135 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 8
Rec. Max
14
order qty 4
Service level
99.9%
stockout risk now 29%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 261 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 5 functional locations

4 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-506A
COOLING WATER PUMP
A1238.76
PX_PP-1383
PROPYLENE PUMP
A100.19
PX_PP-1809B
SEAL OIL PUMP
A100.19
PY_PP-1374
C3 RECYCLE PUMP
B100.19
PX_PP-705
METHANOL PUMP
S100.19

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026LowPX_PP-506APP-506A high vibration
09 Sept 2026MediumPX_PP-506AReplace lamp as per PM finding
01 Aug 2026MediumPX_PP-506AOil leak at PP-506A bearing housing
20 Jun 2026MediumPX_PP-506AReplace lamp as per PM finding
11 Jun 2026LowPX_PP-506ALeak from packing
30 May 2026LowPX_PP-506AInstall scaffolding at PP-506A
28 May 2026MediumPX_PP-506APP-506A discharge pressure low
19 May 2026MediumPX_PP-506APP-506A discharge pressure low
12 Apr 2026MediumPX_PP-506AOverhaul PP-506A
31 Mar 2026LowPX_PP-506AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
13 Jan 20262201000014517Corrective