Sparely
DU

SLEEVE,SHAFT,MODEL GY132,INCOLOY

Material 4100008803 · SLEEVE · Plant 1000

AReorderCriticalStockout
Material
4100008803
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
A (6 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 6.3 EA/year: 4.9 unplanned (credibility blend: own history + installed-base prior) + 1.4 from the maintenance plan.
  • 2.Lead time ~135 days; expected demand during lead time 2.5 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 15.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 15 now.
  • 5.Installed on 7 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
15 EA
Rp 121.3M · order by 01 Oct 2026
Expected arrival ≈ 135 days
Convert to Stock ItemPlanned demand in lead timePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 9
Rec. Max
15
order qty 4
Service level
100.0%
stockout risk now 100%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 78 days ago, 3 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 7 functional locations

6 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1864
FUEL OIL PUMP
A162.33
PX_PP-283B
BFW PUMP
A131.47
PX_PP-556A
LEAN AMINE PUMP
A100.19
PX_PP-1498C
CHARGE GAS PUMP
B151.90
PX_PP-1928
FUEL OIL PUMP
B331.05
PX_PP-1352
LUBE OIL PUMP
B100.19
PX_PP-367A
REFLUX PUMP
C100.19

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PP-556APump overhaul0.72
02 Jul 2027PX_PP-1498CPump overhaul0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_PP-1864Install scaffolding at PP-1864
03 Sept 2026LowPX_PP-283BLeak from packing
25 Aug 2026LowPX_PP-1498C[MSI-B-26-LAH-309/M] Replace line
22 Jul 2026HighPX_PP-1498CInstall scaffolding at PP-1498C
08 Jul 2026HighPX_PP-1928PP-1928 discharge pressure low
16 Jun 2026MediumPX_PP-1498COverhaul PP-1498C
28 Apr 2026MediumPX_PP-1498COil leak at PP-1498C bearing housing
28 Apr 2026MediumPX_PP-1864Install cover plate for MCP cracking
04 Apr 2026MediumPX_PP-1864Leak from packing
15 Mar 2026EmergencyPX_PP-1864Overhaul PP-1864

Recent goods issues

Posting dateQtyOrderOrder type
15 Jul 20261201000006298Corrective
03 Dec 20252201000008508Corrective
03 Dec 20251201000008508Corrective
Sparely