SLEEVE,SHAFT,SIZE JT533,A182F11

Material 4100008829 · SLEEVE · Plant 1000

AReorderCriticalStockout
Material
4100008829
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~135 days; expected demand during lead time 0.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 6 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
6 EA
Rp 48.5M · order by 01 Oct 2026
Expected arrival ≈ 135 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
100.0%
stockout risk now 44%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 267 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 4 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1161
LEAN AMINE PUMP
A141.47
PX_PP-992B
REFLUX PUMP
B183.19
PX_PP-128C
COOLING WATER PUMP
B200.19
PX_PP-251A
SPENT CAUSTIC PUMP
C110.19

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Sept 2026MediumPX_PP-992BPP-992B discharge pressure low
29 May 2026LowPX_PP-1161Replace lamp as per PM finding
21 May 2026MediumPX_PP-992BReplace lamp as per PM finding
30 Apr 2026MediumPX_PP-992BReplace lamp as per PM finding
06 Jan 2026LowPX_PP-1161Replace bearing PP-1161
20 Dec 2025MediumPX_PP-992BPP-992B seal leak
25 Nov 2025LowPX_PP-992BOverhaul PP-992B
19 Oct 2025MediumPX_PP-1161PP-1161 seal leak
18 Oct 2025MediumPX_PP-992BLeak from packing
15 Aug 2025MediumPX_PP-992BPP-992B high vibration

Recent goods issues

Posting dateQtyOrderOrder type
07 Jan 20261201000004561Corrective
04 Sept 20251201000016815Corrective