SLEEVE,SHAFT,SIZE OW156,A105

Material 4100008869 · SLEEVE · Plant 1000

AReduceNon-moving
Material
4100008869
Category
SLEEVE
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
135 d · P80 210 d
Unit price
Rp 8.1M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~135 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.Stock 7 exceeds the level to keep (3) by 4.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 0%
Unit price
Rp 8.1M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 459.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~67 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1862
HYDROGEN PUMP
A151.47
PX_PP-1718
PROPYLENE PUMP
B1124.04
PY_PP-490
COOLING WATER PUMP
S162.33

Lead time and procurement

Lead time 135 ± 55 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026EmergencyPX_PP-1718Install scaffolding at PP-1718
18 Sept 2026MediumPX_PP-1718Replace bearing PP-1718
27 Aug 2026MediumPX_PP-1718Install scaffolding at PP-1718
08 Aug 2026MediumPY_PP-490PP-490 high vibration
08 Jul 2026MediumPX_PP-1718PP-1718 discharge pressure low
31 May 2026LowPX_PP-1862PP-1862 seal leak
17 May 2026MediumPX_PP-1862Replace lamp as per PM finding
09 May 2026MediumPX_PP-1718Oil leak at PP-1718 bearing housing
19 Apr 2026LowPX_PP-1718Leak from packing
10 Apr 2026HighPX_PP-1862Install scaffolding at PP-1862

Recent goods issues

Never issued in the 17-month history.